Solar and renewables in Croydon

Croydon received 28 renewable energy applications in the last 12 months, including 1 battery storage site and 6 heat pumps. Of the 18 decided so far, 15 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Croydon

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 10 of 10 applications
9 Oct 2026 Awaiting decision 26/02884/LP

50 Ashburton Avenue Croydon CR0 7JE

Erection of rear dormer roof extension with solar panels on the dormer roof and insertion of 2 no. rooflights into the front roofslope.

LDC (Proposed) Operations edged Croydon
7 Oct 2026 Awaiting decision 26/02729/FUL

22 - 24 Chipstead Valley Road Coulsdon CR5 2RA

Demolition of part of building, alterations, erection of two/three storey rear extension to provide ancillary space for existing shop and a 1 x two be...

Full planning permission Croydon
1 Oct 2026 Awaiting decision 26/02234/HSE

12B Victoria Avenue South Croydon CR2 0QP

Demolition of conservatory. Erection of single storey rear extension. Conversion of garage into a study room. Demolition of rear outbuilding. Erection...

Householder Application Croydon
1 Oct 2026 Awaiting decision 26/02802/HSE

49 Rickman Hill Coulsdon CR5 3DT

Demolition of garage. Erection of single/two storey front/side/rear extensions to include new front porch and integral storeroom. Installation of ASHP...

Householder Application Croydon
30 Sept 2026 Awaiting decision 26/02782/HSE

9 Warwick Road Coulsdon CR5 2EF

Demolition of outbuilding, alterations, erection of single storey side extension to form plant room with raised patio area, installation of A/C and AS...

Householder Application Croydon
9 Sept 2026 Awaiting decision 26/02560/GPDO

Jubilee Wing South Croydon University Hospital 530 London Road Thornton Heath CR7 7YE

Installation of solar panels on buildings 42 (Jubilee North) and 43 (Jubilee South).

Prior Appvl - solar PV equipment replace Croydon
8 Sept 2026 Awaiting decision 26/02231/GPDO

6 - 10 Beddington Farm Road Croydon CR0 4XB

Installation of solar photovoltaic panel array to the East side of Voith Turbo building (Application for Prior Approval under Schedule 2, Part 14, Cla...

Prior Appvl - solar PV equipment replace Croydon
3 Sept 2026 Approved 20 Oct 26/02489/FUL

Rowdown Primary School Calley Down Crescent Croydon CR0 0EG

Installation of air source heat pumps and associated works including compound enclosure.

Full planning permission Croydon
13 Aug 2026 Awaiting decision 26/02304/HSE

145 Gibson's Hill Norbury London SW16 3EX

Alterations, erection of a single storey rear extension, construction of a dormer extension within the side roof slope, installation of air source hea...

Householder Application Croydon
31 Jul 2026 Approved 24 Sep 26/02180/HSE

39 Warwick Road Coulsdon CR5 2EF

Alterations, demolition of existing conservatory and porch, erection of part single/two-storey rear/side extension, single-storey rear/side extension ...

Householder Application Croydon
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Croydon

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Croydon?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Croydon. You can also narrow the alert to a postcode, street, or drawn area.

We check Croydon's planning portal daily. New solar & renewables applications appear here within a day of being published.