Solar and renewables in Mole Valley

Mole Valley received 43 renewable energy applications in the last 12 months, including 1 solar farm, 5 battery storage sites and 8 heat pumps. Of the 28 decided so far, 22 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Mole Valley

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 12 of 12 applications
29 Oct 2026 Live MO/2026/01624

9 Lonsdale Road, Dorking, RH4 1JP

Demolition of existing rear conservatory, raise roof ridge height and erection of two-storey front and rear extensions with accommodation in roof spac...

Detailed Householder Mole Valley
21 Oct 2026 Live MO/2026/01553

38 Poplar Avenue, Leatherhead, KT22 8SH

Installation of 100mm external wall insulation to all elevations and installation of 4 No. solar panels to the South West elevation.

Detailed Householder Mole Valley
16 Oct 2026 Live MO/2026/01552

12 Poplar Avenue, Leatherhead, KT22 8SH

Installation of 100mm external wall insulation to all elevations and installation of 6 No. solar panels to the South East elevation.

Detailed Householder Mole Valley
16 Oct 2026 Live MO/2026/01528

32 Church Road, Leatherhead, KT22 8BD

Replacement of 3 No. existing windows with uPVC vertical sliding sash windows to the front and rear, replacement of porch window with a fixed-pane win...

Detailed Householder Mole Valley
13 Oct 2026 Live MO/2026/01559

2 Garlic Cottages, Hogden Lane, Ranmore Common, RH5 6SY

Alterations to outbuilding to include conversion of internal garage bay and installation of solar panels to eastern roof slope, rearrangement of solar...

Detailed Householder Mole Valley
12 Oct 2026 Live MO/2026/01560

Friars Dene, Druids Close, Ashtead, KT21 2UH

Erection of part single, part two storey side/rear extension and rear roof extension incorporating 1 No. dormer window, erection of 1 No. dormer windo...

Detailed Householder Mole Valley
5 Oct 2026 Live MO/2026/01487

Land Parcel at 52567 145487, Sidlow, RH2 8QG

The proposed development comprises the installation and operation of a ground-mounted solar farm and energy storage system. The solar farm will broadl...

Consultation from Neighbouring Authority Mole Valley
1 Oct 2026 Live MO/2026/01415

St Johns School, Epsom Road, Leatherhead, KT22 8SP

Addition of photovoltaic panels to roof of Henry Dawes Centre classroom building.

Detailed Mole Valley
30 Sept 2026 Live MO/2026/01416

Buckland Court Cottage, Buckland Court, Reigate Road, Buckland, RH3 7EA

Erection of a single-storey rear extension, installation of solar panels, and insertion of a window in the side elevation.

Detailed Householder Mole Valley
23 Sept 2026 Approved 17 Nov MO/2026/01400

The Old Workshop, Clayhill Road, Leigh, RH2 8PD

Erection of single storey rear extension and front porch, roof alterations to include hip-to-gable of eastern end of main roof, raising the lower ridg...

Detailed Householder Mole Valley
22 Sept 2026 Live MO/2026/01366

Fridays Cottage, Friday Street Road, Abinger, RH5 6JR

PLEASE NOTE amended plans: Overhaul and structural repair of the main roof, the erection of a single storey extension to replace the porch and create ...

Detailed Householder Mole Valley
8 Sept 2026 Approved 3 Nov MO/2026/01359

St Johns School, Epsom Road, Leatherhead, KT22 8SP

Installation of photovoltaic panels to the roof of the Performing Arts Centre

Detailed Mole Valley
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Mole Valley

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Mole Valley?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Mole Valley. You can also narrow the alert to a postcode, street, or drawn area.

We check Mole Valley's planning portal daily. New solar & renewables applications appear here within a day of being published.