Solar and renewables in Orkney

Orkney received 46 renewable energy applications in the last 12 months, including 33 heat pumps. All 15 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

16
|
6
|
2
Get alerts for Orkney

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 16 of 16 applications
8 Sept 2026 Awaiting decision 26/217/PP

Plot 12 Saxavord (Land Near), Orphir Village, Orphir Orkney

Erect a house with an air source heat pump

Planning Permission Orkney
7 Sept 2026 Awaiting decision 26/188/PP

4 Dale Park, (Plot 10 Errival) St Ola, Orkney, KW15 1SX

Erect a house with an integral garage and air source heat pump

Planning Permission Orkney
26 Aug 2026 Awaiting decision 26/243/PP

1 King Street, Kirkwall, Orkney KW15 1JF

Reinstate a house and extend, including alterations, install an air source heat pump and erect a boundary fence

Planning Permission Orkney
19 Aug 2026 Awaiting decision 26/227/PP

37 & 39 Victoria Street, Stromness, Orkney KW16 3BS

Change of use from Post Office to mixed use facility (Class 1A/3/10) including creative arts-hub and café/retail. Demolish existing rear outbuildings ...

Planning Permission Orkney
18 Aug 2026 Awaiting decision 26/211/AMC

Roselea Croft (Land Near), Blackhill Road, St Ola Orkney

Erect a house with an integral garage and an air source heat pump

App Matters Specified in Conditions Orkney
18 Aug 2026 Awaiting decision 26/208/PP

Thorden (Land Near), Deerness, Orkney ,

Erect a house with an air source heat pump and garage

Planning Permission Orkney
13 Aug 2026 Awaiting decision 26/222/PP

Berrybank (Land Near), Evie, Orkney

Erect a house with air source heat pump and create an access

Planning Permission Orkney
13 Aug 2026 Awaiting decision 26/148/TPPMAJ

Burgar Hill Wind Farm, Evie, Orkney

Replace five existing turbines (up to 116m to tip, 11.3MW) with 5 wind turbines (up to 149.9m to tip, up to 30MW export) with associated auxiliary inf...

Turbine Planning Permission MAJ Orkney
21 Jul 2026 Awaiting decision 24/353/NMV/01

The Crafty, Junction Road, Kirkwall, Orkney

1. Removal of the concealed gutter and replacement with a face-fixed half-round gutter. 2. Removal of concealed rainwater pipes from within the extern...

Non Material Variation Orkney
20 Jul 2026 Awaiting decision 26/137/PP

Caernarfon (Land Near), Aikerskaill Road, Deerness, Orkney KW17 2QJ

Change of use of agricultural land to garden ground and erect a domestic annex with an air source heat pump

Planning Permission Orkney
6 Jul 2026 Awaiting decision 26/163/PP

Coplands Road (Land Near), Stromness Orkney

Erect 16 houses with solar panels including associated roads, services, landscaping and infrastructure

Planning Permission Orkney
1 Jul 2026 Awaiting decision 26/186/PP

Ferneybrae, Mill Bay Road, Eday Orkney KW17 2AB

Erect a house with three air source heat pumps and an integral garage, associated landscaping and upgrade an access (resubmission of 24/429/PP)

Planning Permission Orkney
22 Jun 2026 Awaiting decision 26/115/PP

Former Yesnaby School, Yesnaby Road, Sandwick, Orkney

Erect a house with an air source heat pump, sewage treatment tank and reinstate redundant house as an outbuilding, and create an access

Planning Permission Orkney
22 Jun 2026 Awaiting decision 26/160/PP

10 King Street, Kirkwall Orkney KW15 1JF

Change of use from dental practice to flats (Class 9), extend stair tower, install replacement windows, doors and rainwater goods and install roofligh...

Planning Permission Orkney
18 Jun 2026 Awaiting decision 24/388/NMV/01

13 Links, Sandy Road, Westray, Orkney KW17 2DH

Install solar panels

Non Material Variation Orkney
16 Jun 2026 Awaiting decision 26/149/LB

Kirbister Mill, Orphir, Orkney KW17 2RA

Convert mill to house including works to re-roof, replacement windows and doors, install solar panels, replace rainwater goods and internal alteration...

Listed Building Orkney
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Orkney

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Orkney?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Orkney. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Orkney's planning portal daily. New solar & renewables applications appear here within a day of being published.