Solar and renewables in Chester

Chester received 42 renewable energy applications in the last 12 months, including 2 battery storage sites and 7 heat pumps. All 14 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

18
|
2
|
1
Get alerts for Chester

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 18 of 18 applications
26/02291/LDC 17 Aug 2026 Awaiting decision

2 Heath Lane Barrow Chester CH3 7LL

Conversion of existing bungalow roof from hipped to gable and rear dormer to create first floor, rooflights to front, removal of chimney stack, altera...

Lawful Development Certificate Chester 17 Aug 2026
26/01897/FUL 27 Jul 2026 Awaiting decision

38 Lache Lane Chester CH4 7LR

Remodelling of existing dwelling to form a two-storey dwelling, including single-storey and first-floor extensions, alterations to the roof incorporat...

Full Application Chester 27 Jul 2026
26/02096/FUL 23 Jul 2026 Awaiting decision

The Old Smithy Huxley Lane Tiverton Chester CW6 9NB

Solar panel installation to the rear (south-facing) roof slopes.

Full Application Chester 23 Jul 2026
26/02115/FUL 8 Jul 2026 Approved

Northwich Brunner Library 89 Witton Street Northwich CW9 5DR

Installation of 26 no. Photo Voltaic Panels to slated south facing pitched roofs.

Full Application Chester 8 Jul 2026
26/02116/LBC 8 Jul 2026 Approved

Northwich Brunner Library 89 Witton Street Northwich CW9 5DR

Installation of 26 no. Photo Voltaic Panels to slated south facing pitched roofs.

Listed Building Consent Chester 8 Jul 2026
26/02098/FUL 7 Jul 2026 Awaiting decision

39 White Friars Chester CH1 1NZ

Installation of roof-mounted solar photovoltaic panels to the rear roof slope and installation of an external battery and inverter unit to the rear el...

Full Application Chester 7 Jul 2026
26/02110/P14 7 Jul 2026 Awaiting decision

Doubletree by Hilton Warrington Road Hoole Village Chester CH2 3PD

Solar PV system installed across a selection of flat rooftops (using a flat roof mounting kit) the modules will be sited at least 1m from all external...

Solar equip on non-domestic premises Chester 7 Jul 2026
26/01901/FUL 6 Jul 2026 Awaiting decision

Rose Cottage Moss Lane Beeston Chester CW6 9SU

Single storey extension to form a new workshop, replacement porch, roof canopy and replacement rear balcony, installation of solar panels and air sour...

Full Application Chester 6 Jul 2026
26/02336/P14 6 Jul 2026 Awaiting decision

284 London Road Northwich CW9 8AJ

Solar panels on a ground floor flat roof on the side and rear of the property

Solar equip on non-domestic premises Chester 6 Jul 2026
26/02060/TPO 6 Jul 2026 Awaiting decision

2 Malvern Avenue Ellesmere Port CH65 5AD

Lime (Tree 25) - Complete removal due to significant structural damage, safety concerns, interference with underground utilities, and severe shading i...

Application to fell/lop TPO trees Chester 6 Jul 2026
26/02058/S73 3 Jul 2026 Awaiting decision

Gifford Lea Retirement Village Frog Lane Tattenhall Chester

Full planning application for 25 Extra Care Units (Use Class C2), with associated access, parking, landscaping, ecological enhancements and other work...

Variation of Conditions Chester 3 Jul 2026
26/01961/P14 26 Jun 2026 Decided

Gordale Nursery and Garden Centre Chester High Road Neston CH64 8TF

Removal of existing PV and Installation of new PV system to south facing roof elevation.

Solar equip on non-domestic premises Chester 26 Jun 2026
26/01950/LBC 25 Jun 2026 Awaiting decision

The Old Glass House 60 Whitchurch Road Christleton Chester CH3 5QD

Installation of solar photovoltaic panels on the rear roof slope of the main building and the side roof slope of the adjoined garage/outbuilding.

Listed Building Consent Chester 25 Jun 2026
26/01681/LDC 23 Jun 2026 Approved

7 Abbey Lane Hartford Northwich CW8 1LX

Lawful development certificate to propose a single storey side extension, garage conversion, alterations to windows and doors, installation of solar p...

Lawful Development Certificate Chester 23 Jun 2026
26/01353/FUL 19 Jun 2026 Awaiting decision

Cotton Edmunds Farm Cotton Lane Chester CH3 7PZ

Change of use of the farmstead to an equestrian educational facility in association with the charity Ride High, construction of an indoor and outdoor ...

Full Application Chester 19 Jun 2026
26/01775/FUL 11 Jun 2026 Awaiting decision

59 Inveresk Road Tilston Malpas SY14 7ED

Proposed Installation of a Small Wind Turbine to side (west) elevation.

Full Application Chester 11 Jun 2026
26/01781/FUL 11 Jun 2026 Awaiting decision

Barnholt Norley Hall Farm Town Farm Lane Norley Northwich WA6 8NH

Single-storey front porch extension and installation of photovoltaic panels to the rear south-facing roof elevation.

Full Application Chester 11 Jun 2026
26/01368/FUL 10 Jun 2026 Awaiting decision

Bank Cottage Bickley Town Lane Bickley Malpas SY14 8EQ

Installation of solar array

Full Application Chester 10 Jun 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Chester

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Chester?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Chester. You can also narrow the alert to a postcode, street, or drawn area.

We check Chester's planning portal daily. New solar & renewables applications appear here within a day of being published.