Kingsmead Square Regency Way Davenham Northwich CW9 8UW Data via plota.co.uk

26/02954/FUL - Full Application Awaiting decision

Proposal

Expansion of existing rapid electric vehicle (EV) charging site with the addition of two new rapid EV charging bays. Existing feeder pillar to be removed and three new feeder pillars are to be installed, along with a battery storage unit (BESS) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Sept 2026
Decision
Target date was 12 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 24 Oct 2026; it is now day 67.

The consultation period closed on 24 Oct 2026.

Site constraints 3

Agricultural land, grade 3a, surveyed
Best and most versatile land (grades 1, 2 and 3a). Source: Natural England's post-1988 ALC field survey (Wolverhampton). Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2; the survey is the definitive reading.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Survey report ↗
Also on the record
Local nature reserve about 347 m away: Marshall's Arm, Hartford; Inside the Davenham built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for battery storage?

Plota Sites searches every land parcel in England and Wales: 9,119 sites fit this search. On and off the market, free to search.

Land for battery storage
Work with planning data?

Every application in Chester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chester
Application type
Full Application
Postcode
CW9 8UW
Received
17 Sept 2026
Validated
17 Sept 2026
Ward
Davenham, Moulton and Kingsmead
Parish
Kingsmead
Applicant
Show

Decision outlook

Day 67, past the statutory target. 92% of utility and infrastructure works in Chester are decided within thirteen weeks, which runs to 17 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 16 Nov 2026.

Day 6711 days past the 56-day target
89%decided within 8 weeks
99%approved
111decided in the last year

Plota live figures for utility and infrastructure works decided by Chester in the last twelve months, from validation. Chester decision record →

Public comments

No public comments yet.

14 neighbours consulted · Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15227266
Planning Portal ref
PP-15227266
Comments by
24 Oct 2026
Env. assessment
No