Land for battery storage

Land of 0.5 to 1.5 ha within 1 km of a primary substation with 5 MW or more spare both ways, or 1.5 to 6 ha within 3 km of a bulk supply point with 30 or more. Flood zone 3 and towns are left out.

9,119 sites fit this search today

Imagery: Mapbox and Maxar. Boundaries: HM Land Registry INSPIRE, Crown copyright.

A land search, from the first words to a shortlist

38 seconds. Type what you are looking for, see the sites that fit, open one and save it to a shortlist.

View in a new tab

What the search looks for

Each line is a filter on the map, so you can widen or tighten any of them.

Open the search
  1. 0.5 to 1.5 ha within 1 km of a primary substation with 5 MW or more spare both ways, or 1.5 to 6 ha within 3 km of a bulk supply point with 30 or more
  2. Out of flood zone 3
  3. Not in a town

On every site

The grid
The nearest primary substation by name, the distance to it, and the spare generation and demand capacity its network operator publishes.
The land
Slope, farmland grade, tree cover and flood zones, with solar yield and mean wind speed for every parcel.
What is there already
Solar, wind and battery schemes on or near the land with their status, and national infrastructure projects that take in part of it.

Why these rules

The National Fire Chiefs Council's guidance (December 2025) starts from 30 m between battery units and occupied buildings, water for two hours and a second way in. A battery of any size in England is decided by the council, not as a national project (Infrastructure Planning (Electricity Storage Facilities) Order 2020).

National policy counts it as essential infrastructure for flood risk, so it must still pass the sequential test (NPPF, August 2026, Annex F and F5). Batteries connect close to a substation. Woodland is left out.

Two sizes, each tied to the substation that can take it: 0.5 to 1.5 ha (about 10 to 50 MW) at a primary substation within 1 km with at least 5 MW spare generation and 5 MVA spare demand, or 1.5 to 6 ha at a bulk supply point within 3 km with at least 30 of each (Electricity North West ES216 connection voltages). Best and most versatile farmland is flagged on each site, not left out.