Pomeroy House Wincham Avenue Wincham Northwich CW9 6GB Data via plota.co.uk

26/03255/FUL - Full Application Awaiting decision

Proposal

Installation of solar PV panels Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Oct 2026
✓
Validated
3 Nov 2026
Decision
Expected by 29 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 19 Dec 2026 and 21 Jan 2027, from Chester's recent commercial premises.

Comments are open until 3 Dec 2026

Comment on this application ↗

Site constraints 5

National infrastructure project about 588 m away: Keuper Gas Storage Project
The site is about 588 m from the project boundary. Underground gas storage, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Wincham and Marston built-up area; Green belt about 43 m away: Merseyside and Greater Manchester; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 7 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Chester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Chester
Application type
Full Application
Postcode
CW9 6GB
Received
9 Oct 2026
Validated
3 Nov 2026
Ward
Marbury
Parish
Wincham
Applicant
Show

Decision outlook

Day 15 of the 56-day target. Chester usually decides commercial premises by day 60.

Day 1545 days to the predicted decision (day 60)
48%decided within 8 weeks
90%approved
98decided in the last year

Plota live figures for commercial premises decided by Chester in the last twelve months, from validation. Chester decision record →

Public comments

No public comments yet.

3 neighbours consulted · Last counted 14 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15285888
Planning Portal ref
PP-15285888
Comments by
3 Dec 2026
Env. assessment
No