Land in councils short of housing land
Open land of 0.4 ha or more beside a town or village, in a council where housing delivery is under 75%, or the plan is over five years old and fewer homes are added a year than the council needs.
50,476 sites fit this search today
Imagery: Mapbox and Maxar. Boundaries: HM Land Registry INSPIRE, Crown copyright.
A land search, from the first words to a shortlist
38 seconds. Type what you are looking for, see the sites that fit, open one and save it to a shortlist.
What the search looks for
Each line is a filter on the map, so you can widen or tighten any of them.
Open the search- Open land of 0.4 ha or more outside national parks
- Where delivery is under 75%, or the local plan is over five years old and fewer homes are added a year than the council needs
On every site
- The council's housing position
- The Housing Delivery Test result, the age of the local plan, and homes added a year against the number the council needs.
- Constraints, measured on the site
- The share of the site in the green belt, each flood zone, a conservation area and the other mapped constraints, each from its named source.
- Planning on and around it
- Ten years of planning applications on the parcel, and homes approved nearby in the last five years.
Why these rules
National policy (NPPF, August 2026, S5(1)(j) and Annex D): development outside settlements can meet an evidenced unmet need for homes, which is deemed to exist where the latest Housing Delivery Test is under 75%; where a plan is over five years old its supply is measured against local housing need (Annex D 8).
Plota counts a council as short where delivery is under 75%, or its plan is over five years old and it adds fewer homes a year than that need; a plan's age alone is not enough. The site report gives each council's own figures.
National parks and the Broads are left out: national policy refuses major development there other than in exceptional circumstances and limits the scale of the rest (NPPF, August 2026, N4); set National park to Any under Constraints to include them. Car parks, yards and hard standing are left out, and land more than 250 m from a town or village. Woodland is left out.
Sites from the search
Six of the sites the search returned on 10 November 2026. Each opens on the map with its record.
-
Cliffsend2.79 ha
Thanet
Housing Delivery Test 70%Local plan age 6.3 years
-
Clyst St. George4.74 ha
East Devon
Housing Delivery Test 84%Local plan age 11 years
-
Bledlow-cum-Saunderton3.33 ha
Buckinghamshire
Housing Delivery Test 94%Local plan age 16 years
-
Brading0.97 ha
Isle of Wight
Housing Delivery Test 37%Local plan age 0.1 years
-
Runton6.14 ha
North Norfolk
Housing Delivery Test 54%Local plan age 0.9 years
-
Warehorne1.55 ha
Ashford
Housing Delivery Test 75%Local plan age 7.7 years
Imagery: Mapbox and Maxar. Boundaries: HM Land Registry INSPIRE, Crown copyright.
Related searches
- Grey belt land in councils short of housingGreen belt next to a town or village, outside national parks, in a council where delivery is under 75%, or the plan is over five years old and fewer homes are added a year than needed
- Land in councils behind on homes0.5 ha or more just outside a built-up area, open, outside national parks, where the council built under 95% of its target
- Grey belt landIn the green belt, within 100 m of a town or village, 0.4 ha or more, open, outside national parks
- Open land for new homes0.4 to 2 ha, open, no excluded constraint mapped on it, outside national parks
