Land for data centres

Flat, compact land of 10 ha or more, at least 150 m across, out of flood zones 2 and 3 now and with climate change, out of coal mining risk and near the strategic road network. Spare demand capacity at the nearest substation is on every site.

3,798 sites fit this search today

Imagery: Mapbox and Maxar. Boundaries: HM Land Registry INSPIRE, Crown copyright.

A land search, from the first words to a shortlist

38 seconds. Type what you are looking for, see the sites that fit, open one and save it to a shortlist.

View in a new tab

What the search looks for

Each line is a filter on the map, so you can widen or tighten any of them.

Open the search
  1. 10 ha or more
  2. Compact
  3. At least 150 m across
  4. Slope under 5°
  5. Out of flood zones 2 and 3 now and with climate change and out of coal mining risk
  6. Within 2 km of a motorway or beside a trunk A road
  7. Outside national parks
  8. No housing estate or village on it

On every site

Roads and traffic
Distance to a motorway and to an A road, and the daily traffic count on the road where the Department for Transport counts it.
Shape and ground
Width at the widest point, how compact the plot is, its slope and the share in each flood zone.
The town it serves
The population of the built-up area, and spare demand capacity at the nearest primary substation.

Why these rules

Operators want flat, flood-free, stable ground near the strategic road network (JLL; a 2026 campus request to government). National policy counts data centres as essential infrastructure for flood risk (NPPF, August 2026, Annex F) and, outside settlements, weighs grid capacity towards an unmet need (E2(2)(b)(ii)); green belt land is kept in and ranked lower.

Housing estates and villages are left out (at most 10 addresses a hectare and 50 in all): 95% of housing sites have more than 11 a hectare and half of industrial sites under 5.

National parks and the Broads are left out: national policy refuses major development there other than in exceptional circumstances and limits the scale of the rest (NPPF, August 2026, N4); set National park to Any under Constraints to include them. Woodland is left out.