Buildings to knock down and rebuild as homes

A single office or industrial building of 150 to 1,000 m² in a town in England, not listed and outside protected areas: the footprint Class ZA lets a developer rebuild as homes.

20,727 sites fit this search today

Imagery: Mapbox and Maxar. Boundaries: HM Land Registry INSPIRE, Crown copyright.

A land search, from the first words to a shortlist

38 seconds. Type what you are looking for, see the sites that fit, open one and save it to a shortlist.

View in a new tab

What the search looks for

Each line is a filter on the map, so you can widen or tighten any of them.

Open the search
  1. One office or industrial building of 150 to 1,000 m² on the energy certificate register
  2. Up to 18 m tall where measured
  3. In a town in England
  4. Not listed
  5. Outside protected areas

On every site

The building
Its footprint, the number of buildings on the plot, and its use and floor area where it is on the energy certificate register.
What takes the right away
Article 4 directions, listed buildings, conservation areas and protected landscapes, mapped against the plot.
Planning on the plot
Ten years of planning applications, each with its decision and a link to the council's record.

Why these rules

Permitted development Class ZA (General Permitted Development Order 2015, Schedule 2, Part 20): a single detached block of flats, or a building for offices, research or light industry, standing on 12 March 2020, built before 1990, vacant for six months, with a footprint of up to 1,000 m² and up to 18 m tall, rebuilt as homes on the same footprint up to 7 m higher and 18 m at most.

Not on article 2(3) land, SSSIs, listed buildings or scheduled monuments, or within 3 km of an aerodrome. Prior approval covers transport, contamination, flooding, design, natural light, amenity, heritage, the demolition and landscaping.