Mynydd Mynyllod , Llandrillo, , Corwen, LL21 0HF Data via plota.co.uk
Proposal
DYLID CYFLWYNO UNRHYW SYLWADAU I PCAC AC NID I'R CYNGOR - PEDW.Infrastructure@gov.wales ********************************************************************* ANY COMMENTS SHOULD BE SUBMITTED TO PEDW & NOT TO THE COUNCIL - PEDW.Infrastructure@gov.wales ********************************************************************* Mae’r datblygiad yn cynnwys: Hyd at naw thyrbin a cyffyrdd trydan allanol. Sefyllfau caled craen ac ardaloedd ‘laydown’ wrth och phob thyrbin. Tua 7.5km o trac (7.3km o faint fydd yn drac newydd ac 0.2km) o drac fodol) a gweithgareddau peirianneg cysylltiedig. Is-safle trydanol ac adeilad rheoli; System storio batri egni. Cyffyrdd dan ddaear trydanol yn cysylltu’r tyrbin i’r Is-Safle trydanol. Chwe croes cwrs ddŵr a gweithgareddau cysylltiedig. Ardaloedd basio a troi cerbydau. Arwyddion ar y safle. Goleuadau awyrenau. Ffatri swpio ac adeulau dros/dro man storio cyfansoddion fferm gwynt a cynigion rheoli cynefinoedd. The proposed development consists of: up to nine wind turbines and external electrical cubicles; crane hardstandings and adjacent laydown areas for each turbine location; approximately 7.5 km of access tracks (of which approximately 7.3 km will be new track and, 0.2 km will be upgraded existing track) and associated ancillary engineering works; an electrical substation and control building; battery energy storage system; onsite underground electrical cables linking the turbines and the onsite substation; six watercourse crossings and associated infrastructure; onsite vehicle turning heads and passing places; site signage; aviation lighting temporary concrete batching plant and construction / storage compounds for the wind farm, up to two Borrow pits and habitat management proposals Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 433.
Documents 94
Decision & officer reports 1
Statements & assessments 72
Plans & drawings 13
Application forms 3
Consultation & comments 1
Other documents 4
Site constraints 3
Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Plota Sites searches every land parcel in England and Wales: 8,347 sites fit this search. On and off the market, free to search.
Every application in Gwynedd - and every UK council - as a live feed, an API, or a bulk CSV export.
Important details
Decision outlook
Day 433, past the statutory target. 30% of full applications in Gwynedd are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 17 Nov 2026.
Plota live figures for full applications decided by Gwynedd in the last twelve months, from validation. Gwynedd decision record →
Consultation & key dates
- Comments by
- 6 Oct 2025
- Statutory expiry
- 6 Nov 2025
Historical activity at this location
1 nearby application on record - archival context, not part of the live application.
Track this application
Mynydd Mynyllod, Llandrillo, Corwen, LL21 0HF
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
The consultation period closed on 6 Oct 2025.