Land North of Beezon Road Opposite Thomas Hardy Kendal Ltd Beezon Road KENDAL LA9 6BW Data via plota.co.uk

2026/1593/FPA - Full Application Officer Consideration

Proposal

Creation of a hardstanding area for temporary HGV parking to facilitate off-road waiting and manoeuvring of HGVs awaiting access to the adjacent service yard Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Aug 2026
✓
Validated
24 Aug 2026
Decision
Target date was 19 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 91.

The consultation period closed on 24 Sept 2026.

Documents 30

All documents on the council site ↗

Site constraints 6

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special area of conservation 140 m away: River Kent
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 140 m away: River Kent and Tributaries SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Radon affected area, class 4; Inside the Kendal built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
LA9 6BW
Received
12 Aug 2026
Validated
24 Aug 2026
Ward
Kendal Nether
Parish
Kendal
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Pegasus Group

Decision outlook

Day 91, past the statutory target. 72% of commercial and major works in Westmorland and Furness are decided within thirteen weeks, which runs to 23 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 18 Nov 2026.

Day 9135 days past the 56-day target
39%decided within 8 weeks
95%approved
64decided in the last year

Plota live figures for commercial and major works decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →

Consultation & key dates

Consultation
27 Aug 2026
Comments by
24 Sept 2026
Site or press notice
3 Sept 2026
Statutory expiry
16 Dec 2026
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 overall
Relevant to this application:
Householder decisions

Westmorland and Furness is slower than most councils at deciding householder applications: #235 of 296 on speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026