Kent House Mintsfeet Road South KENDAL LA9 6ND Data via plota.co.uk

2026/1840/FPA - Full Application Consultation Started

Proposal

Extension of existing building to create 2no new loading bays with roller shutter doors Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Sept 2026
✓
Validated
12 Oct 2026
Decision
Expected by 7 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 13 Dec 2026 and 1 Jan 2027, from Westmorland and Furness's recent commercial and major works.

Comments are open until 13 Nov 2026

Comment on this application ↗

Site constraints 7

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Public footpath about 19 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Special area of conservation about 119 m away: River Kent
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 119 m away: River Kent and Tributaries SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Radon affected area, class 4; Inside the Kendal built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 20 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
LA9 6ND
Received
18 Sept 2026
Validated
12 Oct 2026
Ward
Kendal Nether
Parish
Kendal
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
United Utilities

Decision outlook

Day 16 of the 56-day target. Westmorland and Furness usually decides commercial and major works by day 72.

Day 1656 days to the predicted decision (day 72)
40%decided within 8 weeks
96%approved
54decided in the last year

Plota live figures for commercial and major works decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →

Consultation & key dates

Consultation
20 Oct 2026
Comments by
13 Nov 2026
Site or press notice
23 Oct 2026
Statutory expiry
7 Dec 2026
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 councils
Relevant to this application:
Householder decisions

Westmorland and Furness is slower than most councils at deciding householder applications, ranking #235 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026