Unit 1 To 2 Station Yard Station Road Kendal LA9 6BT Data via plota.co.uk

2026/1943/FPA - Full Application Consultation Started

Proposal

Subdivision of existing premises to create 3 units (from 2 units), including change of use of Unit 1 from warehouse (Use Class B8) to garage and tyre storage (Use Class E(g)(iii)). Installation of a roller shutter door, reinstatement of existing roller shutter door, erection of internal partition wall and installation of associated signage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Oct 2026
✓
Validated
26 Oct 2026
Decision
Expected by 21 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 24 Dec 2026 and 8 Jan 2027, from Westmorland and Furness's recent changes of use.

Comments are open until 20 Nov 2026

Comment on this application ↗

Site constraints 8

Special area of conservation about 172 m away: River Kent
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 172 m away: River Kent and Tributaries SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Scheduled monument about 193 m away: Stramongate Bridge; Radon affected area, class 4; Conservation area about 47 m away: Kendal; 2 listed buildings within 150 m of the postcode pin; Inside the Kendal built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
LA9 6BT
Received
8 Oct 2026
Validated
26 Oct 2026
Ward
Kendal Nether
Parish
Kendal
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Koha Architects

Decision outlook

Day 23 of the 56-day target. Westmorland and Furness usually decides changes of use by day 68.

Day 2345 days to the predicted decision (day 68)
38%decided within 8 weeks
81%approved
95decided in the last year

Plota live figures for changes of use decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →

Consultation & key dates

Consultation
29 Oct 2026
Comments by
20 Nov 2026
Site or press notice
30 Oct 2026
Statutory expiry
21 Dec 2026
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 councils
Relevant to this application:
Change of use

Westmorland and Furness is slower than most councils at deciding householder applications, ranking #235 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026