St Agnes Church Church Lane Cawston Norfolk Data via plota.co.uk

2026/2586 - Works to trees in Conservation Area Approved

Proposal

T16 - Ash Tree (height 23m width 13m) - remove hanging branch, reduce crown growth on eastern and western sides by 1.5-2m Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Sept 2026
✓
Approved
28 Sept 2026

Approved on 28 Sept 2026 · Delegated · Last checked 29 Sept 2026

Site constraints 9

Grade I listed: The Parish Church of St Agnes
List entry 1263465 · 7 m away · 9 more listed buildings within 150 m (1 Grade II*, 8 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 9 with distances
Historic England ↗
Nutrient neutrality catchment: River Wensum SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Cawston Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Public footpath 21 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 758 m away: Sheringham and Dudgeon Extension Projects
The site is 758 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Norfolk Vanguard (decided, 801 m); Norfolk Boreas (decided, 826 m); Hornsea Project Three Offshore Wind Farm (decided, 1513 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Heritage at risk 6 m away: Parish Church of St Agnes, Church Lane; Inside the Cawston (Broadland) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to trees in Conservation Area
Received
2 Sept 2026
Validated
2 Sept 2026
Ward
Eynesford
Parish
Cawston
Target decision
14 Oct 2026
Decision
No objections
Decision date
28 Sept 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 26 days from validation, about the council's usual 24 days. Approved, as 98% of tree and landscaping works here are.

99%decided within 8 weeks
98%approved
593decided in the last year

Plota live figures for tree and landscaping works decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

Last counted 29 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15196959
Planning Portal ref
PP-15196959
Statutory expiry
14 Oct 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Other decisions

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use