St Agnes Church Church Lane Cawston Norfolk Data via plota.co.uk

2026/3408 - Works to trees in Conservation Area Pending Consideration

Proposal

T2 - Ash crown lift to 1.5m over play area; Area C - Conifers reduce by 6m to form even height; T6 Sweet Chestnut Crown lift to 2.4m and back lower growth from roadside with approx 0.5m-4m clearance; T7 Sweet Chestnut Crown lift to 2.4m and back lower growth from roadside with approx 0.5m-4m clearance; T8 2 x Sycamores Crown lift to 2.4m over path; T9 Scots Pine Crown lift to 5.4m current spread N6m, S5m, E2m, W6m reduce crown by approx 2m; T10 - Laburnum Current height 6m Spread N6m, S3m, E4m W4m reduce W,N and E by 2m; T11 Scots Pine Crown lift to approx 5.4m Current spread N5m, S4m, E3m W6m reduce by 2m. Trees located in both the graveyard of St Agnes Church, as well as Cawston Cemetery. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Nov 2026
✓
Validated
17 Nov 2026
Decision
Expected by 29 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 11 Dec 2026, from South Norfolk Broadland's recent tree and landscaping works.

Site constraints 9

Grade I listed: The Parish Church of St Agnes
List entry 1263465 · 7 m away · 9 more listed buildings within 150 m (1 Grade II*, 8 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 9 with distances
Historic England ↗
Nutrient neutrality catchment: River Wensum SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Cawston Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Public footpath 21 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 758 m away: Sheringham and Dudgeon Extension Projects
The site is 758 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Norfolk Vanguard (decided, 801 m); Norfolk Boreas (decided, 826 m); Hornsea Project Three Offshore Wind Farm (decided, 1.5 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Heritage at risk 6 m away: Parish Church of St Agnes, Church Lane; Inside the Cawston (Broadland) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 19 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to trees in Conservation Area
Received
13 Nov 2026
Validated
17 Nov 2026
Ward
Eynesford
Parish
Cawston
Case officer
Show
Target decision
29 Dec 2026
Decision level
Schedule 1 - Delegate
Agent
Feeney's Tree Services
Freehold owner
Show

Decision outlook

Day 6 of the 56-day target. South Norfolk Broadland usually decides tree and landscaping works by day 24.

Day 650 days to the 56-day target
99%decided within 8 weeks
98%approved
799decided in the last year

Plota live figures for tree and landscaping works decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15370589
Planning Portal ref
PP-15370589
Statutory expiry
29 Dec 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 overall
Relevant to this application:
Other decisions

South Norfolk Broadland is #136 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.