Honingham Thorpe Farm Norwich Road Honingham Norfolk NR9 5BZ Data via plota.co.uk

2026/2592 - Full Pending Consideration

Proposal

Installation of underground electricity cable by horizontal directional drilling (HDD) and associated works, on land adjacent to the consented Maleys Solar Farm cable route 20220393 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Sept 2026
✓
Consultation
28 Sept 2026
Decision
Expected by 2 Dec 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 82.

The consultation period closed on 22 Oct 2026.

Site constraints 5

Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 345 m away: A47 North Tuddenham to Easton
The site is 345 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Sheringham and Dudgeon Extension Projects (decided, 1.3 km); Hornsea Project Three Offshore Wind Farm (decided, 1.8 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Colton (South Norfolk) built-up area; Priority habitat 15 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for a solar farm?

Plota Sites searches every land parcel in England and Wales: 29,327 sites fit this search. On and off the market, free to search.

Land for solar farms
Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
NR9 5BZ
Received
2 Sept 2026
Validated
2 Sept 2026
Ward
Great Witchingham
Parish
Honingham
Case officer
Show
Target decision
2 Dec 2026
Decision level
Delegated
Applicant
Show
Agent
Pathfinder Clean Energy

Decision outlook

Day 82, past the statutory target. 77% of utility and infrastructure works in South Norfolk Broadland are decided within thirteen weeks, which runs to 2 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 8226 days past the 56-day target
56%decided within 8 weeks
98%approved
113decided in the last year

Plota live figures for utility and infrastructure works decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

1comment received
1 supporting

16 neighbours consulted · Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15195786
Planning Portal ref
PP-15195786
Neighbours
24 Sept 2026
Consultation
28 Sept 2026
Comments by
22 Oct 2026
Site or press notice
28 Sept 2026
Statutory expiry
2 Dec 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 overall
Relevant to this application:
Householder decisions

South Norfolk Broadland is #136 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026