99 Bishopsgate London EC2M 3XD Data via plota.co.uk

26/01519/NMA - Non-material Amendments Under Consideration

Proposal

Application for non-material amendments under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission (dated 28.10.2025) for the following works: (a) Amendment to condition 99 (Approved Drawings) for design changes including (i) adjustment to building location within the site (ii) changes to exit locations at ground level and associated alteration to City Market floorspace (iii) increase in height of cycle hub roof by 1.4m (iv) increase in height of main building by 400mm (v) removal of columns at ground floor (vi) introduction of new public route (vii) façade changes to structural beams, and (viii) other associated works; (b) Amendment to Description of Development to reflect proposed phasing of the development; (c) Introduction of new condition related to phasing of the development; (d) Amendment to Condition 3 (Servicing Bay Headroom) to reduce the headroom to 3.7m; (e) Amendment to Condition 61 (Building Height) to accommodate changes; (f) Amendment to Condition 87 (Fire Strategy) to update the document reference; (g) Amendment to Condition 88 (Approved Floorspace) to reflect the changes; and (h) Associated amendments to conditions 17, 20, 21, 22, 29, 34, 36, 37, 39, 40, 44, 45, 46, 48, 50, 52, 59, 73, 77, 78, 79, 80, 81, 82, 93, 94, and 95 to reflect the above changes. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Oct 2026
✓
Consultation
9 Nov 2026
Decision
Expected by 23 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 23 Nov 2026.

Comments are open until 7 Dec 2026

Comment on this application ↗

Documents 104

Plans & drawings 92

PDF 99BG_SECTION 96 ISSUE DIS Other · 26 Oct 2026 View ↗ PDF PHASE 2 PHASING PLAN Drawing · 26 Oct 2026 View ↗ PDF LEVEL 51 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 49 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 54 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 56 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF ROOF PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 34 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 33 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 32 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 35 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 37 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 40 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 41 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 42 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 43 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 44 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 45 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 47 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 46 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 48 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF SOUTH ELEVATION EXTERNAL CORE PROPOSED Drawing · 26 Oct 2026 View ↗ PDF SECTION BB PROPOSED Drawing · 26 Oct 2026 View ↗ PDF SECTION AA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF SECTION WINTER GARDENS PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 53 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 28 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 29 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 30 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 31 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF EAST ELEVATION EXTERNAL CORE INTERFACES PROPOSED Drawing · 26 Oct 2026 View ↗ PDF SOUTH ELEVATION EXTERNAL CORE PROPOSED Drawing · 26 Oct 2026 View ↗ PDF NORTH ELEVATION TYPICAL FLOOR EXTERNAL TERRACE PROPOSED Drawing · 26 Oct 2026 View ↗ PDF NORTH ELEVATION TYPICAL FLOORS PROPOSED Drawing · 26 Oct 2026 View ↗ PDF NORTH ELEVATION TYPICAL FLOOR -HIGH LEVEL TERRACE PROPOSED Drawing · 26 Oct 2026 View ↗ PDF NORTHEAST ELEVATION CYCLE HUB PROPOSED Drawing · 26 Oct 2026 View ↗ PDF DETAIL BAY NORTH ELEVATION LOWER LEVELS PROPOSED Drawing · 26 Oct 2026 View ↗ PDF DETAIL BAY SOUTH ELEVATION EXTERNAL CORE PROPOSED Drawing · 26 Oct 2026 View ↗ PDF PAVILION AND CYCLE HUB ELEVATION Drawing · 26 Oct 2026 View ↗ PDF PROPOSED EAST ELEVATION Drawing · 26 Oct 2026 View ↗ PDF LEVEL 57 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 58 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF PUBLIC ARCADE SOFFITS GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF RSHP-P-3000-P-00 Site Plan · 26 Oct 2026 View ↗ PDF BASEMENT LEVEL 2 PLAN GENERAL ARRANGEMENT PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 08 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 09 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 07 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 10 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 11 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 12 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 15 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 14 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 13 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 16 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 19 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 22 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 24 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 25 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 26 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 27 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 38 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF PHASE 1 EARLY IMPLEMENTATION WORKS PLAN Drawing · 26 Oct 2026 View ↗ PDF PHASE 0 EARLY IMPLEMENTATION WORKS PLAN Drawing · 26 Oct 2026 View ↗ PDF PHASE 2 EARLY IMPLEMENTATION WORKS PLAN Drawing · 26 Oct 2026 View ↗ PDF PHASE 0 PHASING PLAN Drawing · 26 Oct 2026 View ↗ PDF PHASE 1 PHASING PLAN Drawing · 26 Oct 2026 View ↗ PDF PROPOSED WEST ELEVATION Drawing · 26 Oct 2026 View ↗ PDF PROPOSED NORTH ELEVATION Drawing · 26 Oct 2026 View ↗ PDF PROPOSED SOUTH ELEVATION Drawing · 26 Oct 2026 View ↗ PDF PROPOSED ELEVATION IN CONTEXT NORTH Drawing · 26 Oct 2026 View ↗ PDF PROPOSED ELEVATION IN CONTEXT NORTH Drawing · 26 Oct 2026 View ↗ PDF PROPOSED ELEVATION IN CONTEXT SOUTH WEST Drawing · 26 Oct 2026 View ↗ PDF LEVEL 52 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 50 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 55 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF BASEMENT LEVEL 3 PLAN GENERAL ARRANGEMENT PROPOSED Drawing · 26 Oct 2026 View ↗ PDF BASEMENT LEVEL 1 PLAN GENERAL ARRANGEMENT PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 01 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 02 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF GROUND FLOOR PLAN GENERAL ARRANGEMENT PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 04 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 03 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 06 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 05 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 21 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 23 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 20 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 18 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 17 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 36 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗ PDF LEVEL 39 PLAN GA PROPOSED Drawing · 26 Oct 2026 View ↗

All documents on the council site ↗

Associated applications 11

Site constraints 11

Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Scheduled monument 48 m away: London Wall: remains of Roman and medieval wall from W end of All Hallows Church to 38 Camomile Street
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
National infrastructure project 723 m away: Thames Tideway Tunnel
The site is 723 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 17 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
16 listed buildings within 150 m
Nearest: Guild Church of St Ethelburga the Virgin, Grade I, 47 m away · 4 Grade I, 1 Grade II*, 9 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 16 with distances
Historic England ↗
Also on the record
Conservation area 37 m away: St Helen's Place; Heritage at risk 48 m away: London Wall: remains of Roman and medieval wall from west end of All Hallows Church to 38 Camomile Street; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre 33 m away: Liverpool Street.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 10 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area42,522 m² (457,703 sq ft)
Energy ratingD (asset rating 100)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in February 2018, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-material Amendments
Postcode
EC2M 3XD
Received
26 Oct 2026
Validated
26 Oct 2026
Ward
Cornhill
Case officer
Show
Target decision
23 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
DP9 Ltd
Leaseholder
Show

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15318452
Planning Portal ref
PP-15318452
Consultation
9 Nov 2026
Comments by
7 Dec 2026
Statutory expiry
23 Nov 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 overall
Relevant to this application:
Householder decisions

City of London is one of the fastest councils in England for householder decisions: #1 of 296 on speed. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.