7 - 8 Bishopsgate Churchyard London EC2M 3TJ Data via plota.co.uk

25/01325/LDC - Submission of details (LBC/CAC) Approved

Proposal

Submission of precautions are taken to secure and protect original external and internal features pursuant to Condition 3 and method statement for works pursuant to Condition 4 part c of Listed Building Consent dated 06.09.2023. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Sept 2025
✓
Consultation
23 Oct 2025
✓
Approved
25 Nov 2025

Approved on 25 Nov 2025 · Delegated Decision · Last checked 1 Nov 2026

Associated applications 2

  • Part of

    Listed buildingApprovedcouncil archive

    Conditions 3, 4 discharged

    • ConditionsSubmission of precautions are taken to secure and protect original external and internal…This application25/01325/LDC

Site constraints 13

17 listed buildings within 150 m of the postcode pin
Nearest: 8, Bishopsgate Churchyard, Grade II, the postcode pin is inside its outline · 2 Grade I, 2 Grade II*, 13 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 17 with distances
Historic England ↗
Scheduled monument about 22 m away: London Wall: remains of Roman and medieval wall from W end of All Hallows Church to 38 Camomile Street
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
National infrastructure project about 808 m away: Thames Tideway Tunnel
The site is about 808 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 29 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Conservation area about 27 m away: Bishopsgate; Heritage at risk about 22 m away: London Wall: remains of Roman and medieval wall from west end of All Hallows Church to 38 Camomile Street; Registered park or garden about 227 m away: Finsbury Circus; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space about 3 m away; Town centre about 40 m away: Liverpool Street.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Submission of details (LBC/CAC)
Postcode
EC2M 3TJ
Received
29 Sept 2025
Validated
29 Sept 2025
Ward
Bishopsgate
Case officer
Show
Target decision
24 Nov 2025
Decision
Approved
Decision date
25 Nov 2025
Decision level
Delegated Decision
Applicant
Show
Agent
DP9 Limited

How this decision compares

Decided in 57 days from validation, 8 days faster than City of London's median of 65 for discharge of conditions. Approved, as 100% of discharge of conditions here are.

42%decided within 8 weeks
100%approved
659decided in the last year

Plota live figures for discharge of conditions decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

No public comments yet.

Last counted 1 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14345194
Planning Portal ref
PP-14345194
Comments by
18 Nov 2025
Site or press notice
23 Oct 2025
Committee
25 Nov 2025
Statutory expiry
24 Nov 2025
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 councils
Relevant to this application:
Householder decisions

City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 296. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026