25/01745/5REG - Reg 5 Notifications Under Consideration

Proposal

NOTIFICATION UNDER THE ELECTRONIC COMMUNICATIONS CODE (CONDITIONS AND RESTRICTIONS) REGULATIONS 2003 (AS AMENDED), Installation of 1No. equipment housing cabinet and ancillary development thereto. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Dec 2025
Decision
Target date was 2 Jan 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 353.

Site constraints 11

Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Scheduled monument 55 m away: London Wall: section of Roman wall and bastion beneath Crosswall, No. 1 America Square and Fenchurch Street railway station
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
National infrastructure project 126 m away: Thames Tideway Tunnel
The site is 126 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 608 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
Conservation area 26 m away: Crescent; 7 listed buildings within 150 m; World heritage site 171 m away: Tower of London; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 27 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area205 m² (2,207 sq ft)
Energy ratingC (asset rating 63)
UseA1/A2 Retail and Financial/Professional services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in November 2018, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Reg 5 Notifications
Postcode
EC3N 1LA
Received
5 Dec 2025
Validated
5 Dec 2025
Ward
Tower
Case officer
Show
Target decision
2 Jan 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 353, past the statutory target. 73% of prior approvals in City of London are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 19 Nov 2026.

Day 353297 days past the 56-day target
53%decided within 8 weeks
100%approved
44decided in the last year

Plota live figures for prior approvals decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

No public comments yet.

Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Committee
30 Dec 2025
Statutory expiry
2 Jan 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 overall
Relevant to this application:
Householder decisions

City of London is one of the fastest councils in England for householder decisions: #1 of 296 on speed. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.