Common Areas And Grounds Miller's Court London W4 2PF Data via plota.co.uk

2025/02755/TREE - Works to Tree(s) in Conservation Area REGISTERED: Pending recommendation

Proposal

T3 - REAR Parking Area - Winter flowering Cherry - Cut to ground level and grind stump to approx. 300mm below ground level. This tree is also in need of pruning, there is no reason to cut it down. All the cherry trees flower at different times, which make the courtyard interesting and a good habitat for wildlife. Please refuse permission for this tree to be felled. T5 - REAR Parking Area - Plum - Cut to ground level and grind stump to approx. 300mm below ground level. This tree flowered for the first time this year and was really pretty. I think that with care and maintenance it does not need to be felled. T7 - REAR Parking Area - Amelanchier - Cut to ground level and grind stump to approx. 300mm below ground level. It would be terrible to lose this tree. It has beautiful autumn colours and is the most mature of the trees on that side of the courtyard. There is no sign of it dying back. Please refuse permission. As this tree is dying back so heavily, the plan is to remove and replace. T8 - REAR Parking Area - Camelia Reduce all aspects of the crown by approx. 1.5 - 2m to create a tight and tidy shape. The camelia is in a private garden and not on Miller's Court jointly owned land. I am not sure why it is on this application, but we agree it needs pruning. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Oct 2025
Decision
Target date was 2 Dec 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 27 Nov 2026; it is now day 416.

A re-consultation started on 16 Feb 2026. The council has not yet published the new comment deadline.

Site constraints 10

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
The Mall conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve 142 m away: Chiswick Eyot
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
8 listed buildings within 150 m; Registered park or garden 137 m away: Strawberry House; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Metropolitan Open Land 94 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to Tree(s) in Conservation Area
Postcode
W4 2PF
Received
7 Oct 2025
Validated
7 Oct 2025
Ward
Ravenscourt
Case officer
Show
Applicant
Show
Agent
Gareth Humphreys / Tom Boswell Tree Services Ltd

Decision outlook

Day 416, past the statutory target. 94% of tree and landscaping works in Hammersmith and Fulham are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 25 Nov 2026.

Day 416360 days past the 56-day target
75%decided within 8 weeks
96%approved
75decided in the last year

Plota live figures for tree and landscaping works decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
16 Feb 2026
Comments by
18 Nov 2025
Statutory expiry
20 Nov 2028
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 overall
Relevant to this application:
Other decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions: #281 of 296 on speed. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026