16 Miller's Court, London, Hammersmith And Fulham, W4 2PF Data via plota.co.uk

P/2026/02973/TREE - Works to Tree(s) in Conservation Area REGISTERED: Under Assessment

Proposal

Permission is requested to prune back 2 x poplar trees to previous growth points. 1 in garden of number 16 millers court and one next door in number 17 2m poles. diameter 5cm. These are potentially large trees in small rear gardens. Aim is to maintain the trees at an appropriate size for the locatio Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Nov 2026
✓
Validated
19 Nov 2026
Decision
Expected by 14 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 14 Jan 2027, from Hammersmith and Fulham's recent tree and landscaping works.

Site constraints 11

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
The Mall conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve 109 m away: Chiswick Eyot
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
13 listed buildings within 150 m
Nearest: Cedar House, Grade II, 33 m away · 1 Grade I, 2 Grade II*, 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 13 with distances
Historic England ↗
Registered park or garden 101 m away: Strawberry House
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
Flood defence 32 m away (flood gate); Inside the Hounslow built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Metropolitan Open Land 65 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 25 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area159 m² (1,711 sq ft)
Energy ratingD (68 out of 100), could reach C
PropertyMid-terrace house, 7 habitable rooms
Built1983 to 1990
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in July 2012, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to Tree(s) in Conservation Area
Postcode
W4 2PF
Received
18 Nov 2026
Validated
19 Nov 2026
Ward
Ravenscourt
Case officer
Show
Applicant
Show

Decision outlook

Day 8 of the 56-day target. Hammersmith and Fulham usually decides tree and landscaping works by day 56.

Day 848 days to the 56-day target
75%decided within 8 weeks
96%approved
75decided in the last year

Plota live figures for tree and landscaping works decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
19 Nov 2026
Statutory expiry
31 Dec 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 overall
Relevant to this application:
Other decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions: #281 of 296 on speed. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.