Woodland Adjoining 4 Shore Path Gurnard Isle Of Wight Data via plota.co.uk

26/01595/TW - Tree Works (Five Day Notice) Registered

Proposal

**5 DAY NOTICE** T1; Oak - Dismantle to near ground level. Reason: Tree has extensive die back in crown and is leaning heavily over neighbours garden. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Nov 2026
Decision
Expected by 11 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 28 Dec 2026 and 9 Jan 2027, from Isle of Wight's recent tree and landscaping works.

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special area of conservation 19 m away: Solent and Dorset Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
IOW 9 Gurnard Luck to West Cowes Chain Ferry 11 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Cowes built-up area; Priority habitat 26 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 20 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Isle of Wight - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Works (Five Day Notice)
Postcode
PO31 8LL
Received
16 Nov 2026
Validated
16 Nov 2026
Ward
Cowes West And Gurnard
Parish
Gurnard
Case officer
Show
Applicant
Show
Agent
TDG Tree Services

Decision outlook

Day 7 of the 56-day target. Isle of Wight usually decides tree and landscaping works by day 48.

Day 749 days to the 56-day target
68%decided within 8 weeks
94%approved
524decided in the last year

Plota live figures for tree and landscaping works decided by Isle of Wight in the last twelve months, from validation. Isle of Wight decision record →

Public comments

No public comments yet.

Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15371418
Planning Portal ref
PP-15371418
Statutory expiry
23 Nov 2026
Env. assessment
No
Isle of Wight
Planning Authority Score
8.9/10
Excellent
#7 of 296 overall
Relevant to this application:
Householder decisions

Isle of Wight is one of the fastest councils in England for householder decisions: #11 of 296 on speed. Only 15% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Isle of Wight decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #84 of 296
95%
Householder approved
Above avg (90%) #81 of 296
92%
Decided in 8 weeks
Above avg (63%) #11 of 296
15%
Extended time limit
Below avg (41%) #11 of 296
84%
Minor dwellings approved
144 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
94%
Change of use approved
34 decided
792
Total decisions
63 refused in the year to March 2026