Thavies Inn House 3 - 4 Holborn Circus London EC1N 2HA Data via plota.co.uk

Under Consideration 26/01411/PODC
Date received
5 Oct 2026
Date validated
5 Oct 2026
Postcode
EC1N 2HA

Description

Submission of the Local Procurement Strategy (Construction) and Local Training, Skills and Job Brokerage Strategy (Construction) pursuant to Schedule 3 Paragraph 2.1 and Schedule 3 Paragraph 3.5 of the S106 Agreement dated 02 December 2022 (Planning Application Reference: ), as amended by the Deed of Variation dated 01 July 2025 (Planning Application Reference: ). Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision between 4 Dec 2026 and 17 Dec 2026, from City of London's recent commercial premises.

Day 4 of the 56-day target. City of London usually decides commercial premises by day 66.

Day 462 days to the predicted decision (day 66)
39%decided within 8 weeks
100%approved
99decided in the last year

Plota live figures for commercial premises decided by City of London in the last twelve months, from validation. City of London decision record →

Site constraints 12

Protected view corridor: 4A.1 Primrose Hill summit to St Paul's Cathedral
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is. Also in the wider setting of 5A.2 Greenwich Park Wolfe statue to St Paul's Cathedral; 6A.1 Blackheath Point to St Paul's Cathedral.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 321 m away: Thames Tideway Tunnel
The site is about 321 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 706 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
12 listed buildings within 150 m of the postcode pin
Nearest: Lodge St Andrew's Court House Vicarage Wall and Gatepiers to Garden of Number 7 (St Andrew's Court House) and Vicarage, Grade II, about 38 m from the postcode pin · 1 Grade I, 11 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 12 with distances
Historic England ↗
Scheduled monument about 153 m away: Barnard's Inn Hall (Mercers' School)
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Conservation area about 74 m away: Hatton Garden; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space about 37 m away; Town centre about 98 m away: New Oxford Street.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 8 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £10,000 in October 2013. Other property, leasehold.

22 October 2013£10,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 councils
Relevant to this application:
Householder decisions

City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 296. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.