49 Beechwood Grove Acton W3 7HY Data via plota.co.uk

262819PTT - Works to a tree with a TPO Approved

Proposal

TPO 123 T1- Oak - reduce crown back to previous cuts (2m off), to let more light into the garden T2- Beech - reduce crowns back to previous cuts (2m off), to let more light into the garden G1 - sycamore and ash group - reduce branches overhanging 49 Beechwood Grove by up to 2m (back to previous cuts), to let more light into the garden. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
17 Jul 2026
Approved
25 Aug 2026

Approved on 25 Aug 2026 · Last checked 27 Aug 2026

Site constraints 7

Archaeological priority area: Medieval hamlet existed in 1294 with occupation north and south of the lane
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Conservation area 28 m away: Acton Park; Inside the Ealing built-up area; Metropolitan Open Land 30 m away; Designated open space 35 m away; Open access land 39 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land. MoD Byelaw, Section 28 Exclusions, Racecourses and Aerodromes and ECP Margin have been removed..
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Works to a tree with a TPO
Postcode
W3 7HY
Received
17 Jul 2026
Validated
17 Jul 2026
Ward
East Acton
Case officer
Show
Target decision
11 Sept 2026
Decision
Grant with Conditions
Decision date
25 Aug 2026
Applicant
Show
Agent
Forbes Tree Care Ltd

How this decision compares

Decided in 39 days from validation, 16 days slower than Ealing's median of 23 for tree and landscaping works. Approved, as 97% of tree and landscaping works here are.

98%decided within 8 weeks
97%approved
266decided in the last year

Plota live figures for tree and landscaping works decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 27 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15092625
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026