Barbara Speake Stage School East Acton Lane Acton W3 7EG Data via plota.co.uk

253801CND - Discharge Condition Approved

Proposal

Details of Tree Planting and Soil Rooting Volume pursuant to condition 24 of planning permission dated 02/04/2025 for: Minor material amendment (S.73) to vary condition no.2 (approved plans), seeking to vary the wording of conditions 2, 5, 8(a), 10, 13, 15, 16, 17, 18, 19(a), 21, 28(a), 28(b), 28(c) in pursuant to planning permission reference (later amended by ) dated 17/08/2023 for; Demolition of existing building and construction of a 5-storey building with basement for plant equipment fronting East Acton Lane and a 4-storey building to rear of site comprising a total of 38 self-contained residential dwellings (Use Class C3), including associated communal external amenity space, landscaping, plant equipment, refuse and bicycle stores, and associated works Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
18 Sept 2025
✓
Consultation
7 Oct 2025
✓
Approved
17 Nov 2025

Approved on 17 Nov 2025 · Delegated Decision · Last checked 22 Nov 2026

Associated applications 10

Site constraints 7

Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 678 m away: Thames Tideway Tunnel
The site is 678 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square; Designated open space 14 m away; Open access land 24 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land; Metropolitan Open Land 80 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £3,000,000 in July 2020. Other property, freehold.

30 July 2020£3,000,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Discharge Condition
Postcode
W3 7EY
Received
18 Sept 2025
Validated
18 Sept 2025
Ward
East Acton
Case officer
Show
Target decision
13 Nov 2025
Decision
Approved
Decision date
17 Nov 2025
Decision level
Delegated Decision
Agent
Savills
Freehold owner
Show

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14339609
Planning Portal ref
PP-14339609
Consultation
7 Oct 2025
Comments by
21 Oct 2025
Statutory expiry
13 Nov 2025
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.