89 Perryn Road Acton W3 7LT Data via plota.co.uk

260713PALHE - Prior Approval - Larger Home Extension Pending Consideration

Proposal

Single storey rear extension (max 4m deep and max 3.98m high) (following demolition of existing conservatory) (42 Days Prior Approval Notification Process) Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
19 Feb 2026
✓
Validated
1 Nov 2026
✓
Consultation
11 Nov 2026
Decision
Expected by 13 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 26 Dec 2026, from Ealing's recent extensions.

Comments are open until 2 Dec 2026

Comment on this application ↗

Site constraints 5

Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 794 m away: Thames Tideway Tunnel
The site is 794 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Designated open space 39 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 12 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Prior Approval - Larger Home Extension
Postcode
W3 7LT
Received
19 Feb 2026
Validated
1 Nov 2026
Ward
East Acton
Case officer
Show
Target decision
13 Dec 2026
Applicant
Show

Decision outlook

Day 22 of the 56-day target. Ealing usually decides extensions by day 55.

Day 2234 days to the 56-day target
67%decided within 8 weeks
85%approved
1,673decided in the last year

Plota live figures for extensions decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

2 neighbours consulted · Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14718537
Planning Portal ref
PP-14718537
Neighbours
11 Nov 2026
Consultation
11 Nov 2026
Comments by
2 Dec 2026
Statutory expiry
13 Dec 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use