2026/1876 - Full Planning Permission Consultation/Publicity

Proposal

Roof extension to the existing building to provide six self-contained residential units; the reconfiguration of ground floor entrances and provision of a lift to the front of the building; and the provision of cycle parking and refuse storage. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Sept 2026
✓
Validated
21 Sept 2026
Decision
Target date was 16 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 23 Nov 2026, from Hackney's recent extensions.

Site constraints 8

3 Article 4 directions
Whole of the London Borough of Hackney · Tech City (CAZ North) · Exemption Area (part 1). Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Hackney AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Conservation area 50 m away: Pitfield Street; 3 listed buildings within 150 m; Inside the Hackney built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square; National infrastructure project 1.3 km away: London Strategic Heat Main Project, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hackney - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hackney
Application type
Full Planning Permission
Postcode
N1 6BL
Received
2 Sept 2026
Validated
21 Sept 2026
Ward
Hoxton West Ward
Case officer
Show
Target decision
16 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
Davies Murch

Decision outlook

Day 63, past the statutory target. 76% of extensions in Hackney are decided within thirteen weeks, which runs to 21 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 637 days past the 56-day target
54%decided within 8 weeks
84%approved
1,130decided in the last year

Plota live figures for extensions decided by Hackney in the last twelve months, from validation. Hackney decision record →

Consultation & key dates

Statutory expiry
16 Nov 2026
Hackney
Planning Authority Score
2.4/10
Poor
#256 of 296 overall
Relevant to this application:
Householder decisions

Hackney is slower than most councils at deciding householder applications: #220 of 296 on speed. Hackney is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hackney decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #248 of 296
84%
Householder approved
Below avg (90%) #257 of 296
53%
Decided in 8 weeks
Below avg (63%) #220 of 296
46%
Extended time limit
Above avg (41%) #201 of 296
75%
Minor dwellings approved
204 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
50%
Change of use approved
2 decided
1,323
Total decisions
241 refused in the year to March 2026