4 Culvery Close Woodbury Devon EX5 1LZ Data via plota.co.uk

25/1441/TCA - Tree in Conservation Area Approved

Proposal

T1: Birch; G1: Birch; T2: Willow - pollard all trees to previous pruning points. T4: Acer - reduce height to match height of adjacent Cypress, tidy accordingly. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 8 Jul 2025
✓
Approved
12 Aug 2025

Approved on 12 Aug 2025 · Delegated Decision · Last checked 22 Nov 2026

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Woodbury conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
23 listed buildings within 150 m
Nearest: Church Steps Cottages, Grade II, 40 m away · 1 Grade I, 1 Grade II*, 21 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 23 with distances
Historic England ↗
Also on the record
Flood defence 13 m away (engineered high ground, designed for a 1 in 100 year flood); Inside the Woodbury built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 22 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Tree in Conservation Area
Postcode
EX5 1LZ
Received
around 8 Jul 2025
Validated
8 Jul 2025
Ward
Woodbury And Lympstone
Parish
Woodbury
Decision
TPO Not Required
Decision date
12 Aug 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Dartmoor Tree Surgeons

How this decision compares

Decided in 35 days from validation, 5 days faster than East Devon's median of 40 for tree and landscaping works. Approved, as 94% of tree and landscaping works here are.

89%decided within 8 weeks
94%approved
381decided in the last year

Plota live figures for tree and landscaping works decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

No public comments yet.

15 neighbours consulted · Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14146236
Planning Portal ref
PP-14146236
Site or press notice
16 Jul 2025
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 overall
Relevant to this application:
Other decisions

East Devon is #103 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026