6 Orchard Close Woodbury EX5 1ND Data via plota.co.uk

26/2271/FUL - Full Application Awaiting decision

Proposal

Retrospective application for construction of single storey rear & single storey front porch extensions. New timber cladding to first floor & extensions Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 9 Nov 2026
Decision
Expected by 4 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 23 Dec 2026 and 1 Jan 2027, from East Devon's recent extensions.

Site constraints 4

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Conservation area 80 m away: Woodbury; Inside the Woodbury built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 12 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area98 m² (1,055 sq ft)
Energy ratingC (69 out of 100)
PropertyDetached house, 5 habitable rooms
Built1967 to 1975
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in July 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Full Application
Postcode
EX5 1ND
Received
around 9 Nov 2026
Validated
9 Nov 2026
Ward
Woodbury And Lympstone
Parish
Woodbury
Applicant
Show
Agent
Morten Construction Solutions

Decision outlook

Day 9 of the 56-day target. East Devon usually decides extensions by day 49.

Day 947 days to the 56-day target
73%decided within 8 weeks
95%approved
650decided in the last year

Plota live figures for extensions decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

No public comments yet.

2 neighbours consulted · Last counted 12 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15049897
Planning Portal ref
PP-15049897
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Householder decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.