1 km North of Llangurig - Banc Du, Powys Data via plota.co.uk

P/26/1000/DNS - Development of National Significance Valid

Proposal

Representations should be submitted to pedw.infrastructure@gov.wales - Reference DNS CAS-01927-F0T2T1 : Up to six wind turbines (up to 39.6 MW) up to 200m to tip and associated infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Sept 2026
Decision
Expected by 4 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 22 Oct 2026 and 3 Nov 2026, from recent other across the UK.

Going to planning committee

Monday 12 October, 10am

Planning, Taxi Licensing & Rights of Way Committee

Item 4 on the agenda

The committee will decide this application in public. Most councils let objectors, supporters and the applicant speak if they register in advance, each by its own deadline.

Source: Powys's committee agenda. The council can change the date or the agenda up to the meeting.

Documents 249

Statements & assessments 59

PDF 2025-12-22 - Planning Statement Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 11-5b-2 - Peat Survey Locations Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 9-1 - Survey Methodology Summary Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - ES Vol III - Appendix 8-5 - Bat Static Detector Survey Report (2024)_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 11-5 - Water Framework Directive Assessment Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Figure 5.2 - Designated Heritage Assets Supporting documents · 11 Sept 2026 View ↗ PDF 2026-01-06 - ES Vol III - Appendix 12-1 - Transport Assessment_ Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Figure 4.4 - Landscape Character Assessment Supporting documents · 11 Sept 2026 View ↗ PDF Banc Du Energy Park ARWTN Statement v2 Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - ES Vol III - Appendix 8-13 - Ground Level Tree Assessment Report Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol IV - Figure 11-1-1 - Flood Risk and Watercourse Crossing Locations Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Figure 5.1 - Non-Designated Heritage Assets Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 12-1 - Transport Assesment Study Area Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 11-5b-1 - Peat Survey Locations Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol IV - Figure 11-3-1 - Water Features Survey Supporting documents · 11 Sept 2026 View ↗ PDF 2025-02-21 - Final joint Pre-Application Meeting note - Banc Du and Rhiwlas Energy Parks Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol III - Appendix 13-1 - Noise Impact Assessment Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - Design and Access Statement Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 5-3 - Telecommunications Impact Assessment_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 11-3 - Water Features Survey Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - ES Vol III - Appendix 5-2 - Shadow Flicker Impact Assessment_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 8-4 - Bat Static Detector Survey Report (2022)_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 7-9 - Results of peat depth survey with proposed infrastructure overlay Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - EV Vol IV - Figure 8-3 - Study Area Terrestrial Ecology Study Area (Map 2_2) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - Collaborative Benefits Report Appendix 4 - Bute Energy Social Value Policy Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 11-5c-1 - Peat Survey Phases Supporting documents · 11 Sept 2026 View ↗ PDF 2022-06-08 - Pre-Application - Inception Meeting note - Banc Du and Rhiwlas Energy Parks Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 13-1 - Noise Sensitive Receptors Monitoring Positions and Turbine Layout Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - Socio-Economic Statement Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 11-5c-2 - Peat Survey Phases Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 8-6 - Bat Tree Survey Report_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol II - Ch7 - Cultural Heritage Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol II - Ch13 - Noise and Vibration Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 8-11 - Ecological Survey Updates (2025)_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - Collaborative Benefits Report Appendix 2 - Bute Energy Community Energy Approach_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - EV Vol IV - Figure 8-5 - Bat Survey and Mitigation Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - EV Vol IV - Figure 8-3 - Study Area Terrestrial Ecology Study Area (Map 1_2) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 9-8 - Tabulated Summary of Breeding Bird Survey Results_ Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Figure 11.1 - Noise Contour Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - ES Vol III - Appendix 8-1 - Preliminary Ecological Appraisal_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-10-24 - Pre-App Advice Draft ES Check - Banc Du Energy Park Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-13 - Principal Visual Receptors and Blade Tip ZTV_ Transport Routes _ Settlements Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-12 - Habitat Regulations Assessment_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 8-7 - Otter and Water Vole Survey Report_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 3-4 - Arboricultural Impact Assessment Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - ES Vol II - Ch8 - Terrestrial Ecology_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 8-8 - Great Crested Newt eDNA Survey Report_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 11-1 - Flood Consequence Assessment Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 9-1 - Terrestrial Ecology and Ornithology Supporting documents · 11 Sept 2026 View ↗ PDF 2025-02-17 - Joint Pre-Application Advice Request Form - Banc Du and Rhiwlas Energy Parks Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 9-6 - Collision Risk Assessment & Modelling Report Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol II - Ch12 - Traffic and Transport Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 11-7 - Drainage Statement Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 11-2 - Borrow Pit Assessment Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - Green Infrastructure Statement Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 8-2 - Preliminary Ecological Appraisal - AIL Routes_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - EV Vol IV - Figure 8-6 - Terrestrial Ecology Sensitive Receptors Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 8-9 - Reptile Survey Report_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 9-7 - Tabulated Summary of Winter Walkover Survey Results Supporting documents · 11 Sept 2026 View ↗

Plans & drawings 20

PDF 2025-12-22 - ES Vol IV - Figure 1-1 - Site Location Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2025-04-04 - NOTIF002 - Site Location Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 3-10 - Typical Access Track Cross-Section Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 3-12 - Typical Watercourse Crossing Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 3-8 - Site Entrance Arrangement Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Figure 1.2 - Site Layout Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 3-3 - Wind Turbine Foundation Plan and Section Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 3-2 - Wind Turbine Elevation Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 3-11 - Typical Passing Place Plan and Section Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 3-6 - Substation Compound and Control Building Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 3-7 - Substation Compound and Control Building Elevations Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - EV Vol IV - Figure 8-2 - Pine Marten Scoping Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 3-5 - Typical Cable Trench & Track Crossing Cross-Section Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - Site Location Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 3-1 - Development Layout Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 1-2 - Site Boundary Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 11-8 - Outline Soil Management Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 2-1 - Environmental Constraints Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - Development Layout Plan Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 3-14 - Main Construction Compound and Laydown Area Plan Supporting documents · 11 Sept 2026 View ↗

Other documents 165

PDF 2025-12-22 - ES Vol IV - Figure 7-8 - Historic assets included in the EIA potentially subjected to operational effects Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-27 - VP8 Llyn Clwyedog viewpoint Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 11-1 - Study Area Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-7a - Hub Height ZTV with Viewpoints (A3) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-11a - National Landscape Designations and Blade Tip ZTV Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - Collaborative Benefits Report Appendix 5 - Meet the Buyer_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol II - Ch15 - Summary of Effects and Mitigation Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-41 - VP22 Afon Bidno Valley below Pen y Foel Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol II - Ch14 - Cumulative Effects Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol IV - Figure 11-2-1 - Borrow Pit Outline Design Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 3-13 - Watercourse Crossing using Floating Road Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-26 - VP7 Llanidloes Part 2 Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-17a - Cumulative Wind Farms Within 45km Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 11-7 - Private Water Supplies Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-3c - Landscape Character Legend Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-15 - Principal Visual Receptors and Blade Tip ZTV_ Local Context (1) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-5a - Visual Receptors Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol II - Ch10 - Climate Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-39 - VP20 Minor Road Bwlch-y-pridd Commons Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-14 - Principal Visual Receptors and Blade Tip ZTV_ Recreational Routes Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Figure 4.6 - Landscape Designations with Blade Tip ZTV Supporting documents · 11 Sept 2026 View ↗ PDF 2022-11-17 - 01927 - EIA Scoping Direction with appendix Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 9-9 - ITP Energised Raw Flight data Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-28 - VP9 Wye Valley near Dernol Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-22 - VP3 Wye Valley walk to the west of Llangurig Part 1 Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 12-4 - AIL Delivery Routes Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-20 - VP1 Minor Road between valleys of River Wye and River Severn Part 1 Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-42 - VP23 Glan y Nant Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-6b - Blade Tip ZTV with Viewpoints (A1) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 9-2 - Blaen y Glyn - Summary Report_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 11-2 - Bedrock Geology Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-36 - VP17 Minffordd Path Cadair Idris Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-9 - Site Context and Blade Tip ZTV Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-19d - CZTV_ Proposed Development with Operational and Under Construction and Consented Wind Farms (20km) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-34 - VP15 Severn Way to the east of Llanwnog Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - PAC Report Appendices - Part 3_ Supporting documents · 11 Sept 2026 View ↗ PDF 2026-01-06 - Planning Obligations and Draft Conditions Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 7-3 - Historic assets included in the EIA potentially subjected to construction effects Supporting documents · 11 Sept 2026 View ↗ PDF 2026-09-11 - EXNOTE001 - Acceptance Notice Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 9-5 - Year 3 - Flight Activity Summary Report Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-2 - Landform Supporting documents · 11 Sept 2026 View ↗ PDF 2026-01-06 - ES Vol IV - Figure 3-9 - Site Entrance Visibility Splay Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - ES Vol II - Ch1 to 5 - Introductory Chapters Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-1 - Site Location and Study Area Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-19e - CZTV_ Proposed Development and Rhiwlas Wind Farm Application Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-17b - Cumulative Wind Farms Within 20km Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 9-4 - Blaen y Glyn - Non-breeding Season 2018-19 - Ornithology Summary Report_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 12-3 - Personal Injury Acident Locations Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - Turbine Summary Sheet Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 7-11(a-e) - VPCH02 7573 - Church of St Curig_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 3-4 - Typical Crane Pad Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-12 - Landscape Designations, Landscape Character and Blade Tip ZTV (Local Context) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-18 - Non-Wind Cumulative Development Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-10 - Landscape Character and Blade Tip ZTV Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-16 - Principal Visual Receptors and Blade Tip ZTV_ Site Context Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 6-2 - LANDMAP Supporting documents · 11 Sept 2026 View ↗ PDF 2025-04-15 - NOTIF003 - Acceptance of Notification Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-24 - VP5 Minor road near Geufron Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Figure 4.1 - LVIA Study Area Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Figure 4.5 - LANDMAP Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 7-12(a-d) - VPCH03 7573 - View of Church of St Curig Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol III - Appendix 3-1 - Wind Farm Aviation Lighting and Mitigation Report_ Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 4-1 - Alternative Site Development Options Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - ES Vol II - Ch6 - Landscape and Visual Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - PAC Report Appendices - Part 1_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 6-4 - AVAL Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 9-3 - Blaen y Glyn - Year 2 - Ornithology Report_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - Collaborative Benefits Report_ Supporting documents · 11 Sept 2026 View ↗ PDF 2026-09-11 - REPS002 - The Coal Authority Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-19h - CZTV_ Proposed Development and Nant Mithil Application Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-23 - VP4 A44 _ A470 junction to the south of Llangurig Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Figure 4.7 - Visual Receptors with Blade Tip ZTV Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-25 - VP6 Wye Valley NCN 8_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-38 - VP19 March's Pool Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol III - Appendix 10-1 - Carbon Balance Calculations Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 7-2 - Outline WSI Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 7-10(a-e) - VPCH01 MG267 - Domen Giw cairn Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - EV Vol IV - Figure 8-7 - Illustrative Areas for Habitat Enhancements Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 6-2 - Figures 6-2-9 - 6-2-10 Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-37 - VP18 Shepherd's Hut minor road on Banc Du Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 11-5a - Peat Depth Overview Supporting documents · 11 Sept 2026 View ↗ PDF 2026-06-15 - ES Completeness Report (English) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol IV - Figure 11-4-1 - Watercourse Crossing Locations Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-19g - CZTV_ Proposed Development and Bryngydfa Application Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 14-2 - Committed Wind Farms within 45km and 10km Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 11-3 - Superficial Geology Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-35 - VP16 Hill summit to the south of Llandrindod Wells Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - Application Form_ Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - Cover Letter for DNS Application_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 6-5 - Cumulative Developments Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-31 - VP12 Summit of Pen Pumlumon Fawr _ Cambrian Way Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-5b - Principal Visual Receptors - Recreational Routes Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-4b - Regional _ Local Landscape Designations Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-44 - VPA Shropshire Hills National landscape Clun Forest Supporting documents · 11 Sept 2026 View ↗ PDF 2026-09-11 - REPS001 - Office for Nuclear Regulation Supporting documents · 11 Sept 2026 View ↗ PDF 2022-06-08 - Pre-Application - Inception Meeting presentation slides Banc Du & Rhiwlas Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 11-6 - Hydrology Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-6a - Blade Tip ZTV with Viewpoints (A3) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-5c - Principal Visual Receptors - Local Context Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 3-5 - Grid Connection Appraisal Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Figure 1.3 - Constraints Map Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - Collaborative Benefits Report Appendix 3 - Community Investment Strategy_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - Cover Letter for DNS Application & Enclosed Docs_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - PAC Report Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Cover letter Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 14-1 - Committed Wind Farms within 45km Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-43 - VP24 Wye Valley Walk Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - Collaborative Benefits Report Appendix 6 - Future Skills Strategy_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-19a - CZTV_ Proposed Development with Operational and Under Construction Wind Farms (45km) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 7-2 - Historic assets included in the EIA potentially subjected to construction effects Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-4a - National Landscape Designations Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-15 - Principal Visual Receptors and Blade Tip ZTV_ Local Context Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-19f - CZTV_ Proposed Development and Esgair Cwmowen Application Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol III - Appendix 3-3 - Outline CEMP_ Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - ES Vol III - Appendix 5-1 - Matters scoped in or out of EIA and where they are addressed in the ES Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-20 - VP1 Minor Road between valleys of River Wye and River Severn Part 3 Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol III - Appendix 1-1 - EIA Scoping Report Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol III - Appendix 1-2 - EIA Scoping Direction Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-32 - VP13 Esgair Penygarreg Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol III - Appendix 3-2 - Aviation Technical Report_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-20 - VP1 Minor Road between valleys of River Wye and River Severn Part 2 Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-30 - VP11 Penycrocbren on Glyndwr's Way _ Cambrian Way Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - EV Vol IV - Figure 8-4 - Phase 1 Habitat Map Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - ES Vol III - Appendix 6-3 - RVAA Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - ES Vol III - Appendix 8-10 - Outline HMP & NBBR_ Supporting documents · 11 Sept 2026 View ↗ PDF 2026-06-15 - ES Completeness Report (Cymraeg) Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Figure 4.2 - Cumulative Wind Farms Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-19b - CZTV_ Proposed Development with Operational and Under Construction Wind Farms (20km) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 7-1 - Archaelogical DBA Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 11-4 - Soils and Peat Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-26 - VP7 Llanidloes Part 1 Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 7-7 - Historic assets included in the EIA potentially subjected to construction effects Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 7-1 - Historic assets included in the EIA potentially subjected to construction effects Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-21 - VP2 Llangurig_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol II - Ch9 - Ornithology Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 9-10 - Updated Breeding Bird Surveys_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-22 - VP3 Wye Valley walk to the west of Llangurig Part 2 Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - PAC Report Appendices - Part 2_ Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-3a - National Landscape Character Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-40 - VP21 Pen y Gaer Camp Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol III - Appendix 14-1 - Cumulative Long List October 2025 Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - ES Vol II - Ch11 - Land Soils and Water Supporting documents · 11 Sept 2026 View ↗ PDF 2026-08-13 - ES Vol I - Non-technical Summary - Welsh Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Figure 4.3 - Blade Tip ZTV with Viewpoints Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-3b - Landscape Character Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-5d - Visual Receptors Site Supporting documents · 11 Sept 2026 View ↗ PDF 2026-04-10 - ES Vol I - Non-technical Summary Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-19c - CZTV_ Proposed Development with Operational and Under Construction and Consented Wind Farms (45km) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-8 - Horizontal Angle Blade Tip ZTV Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 6-1 - LVIA Methodology Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 12-2 - Traffic Court Locations Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 7-4 - Historic assets included in the EIA potentially subjected to construction effects Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-23 - ES Vol III - Appendix 11-4 - Watercourse Crossing Schedule Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-7b - Hub Height ZTV with Viewpoints (A1) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 9-2 - View-shed Analysis (500m) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-33 - VP14 Moel Hywel hill summit Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-11b - Regional _ Local Landscape Designations and Blade Tip ZTV Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 7-6 - Historic assets included in the EIA potentially subjected to construction effects Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol III - Appendix 2-1 - AIL Route Environmental Review CONFIDENTIAL Supporting documents · 11 Sept 2026 View ↗ PDF 2022-07-15 - EIA Scoping Report - Figure 1.1 - Site Location Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 8-1 - Abnormal Indivisible Load Routes Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 9-3 - View-shed Analysis (2km) Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 7-5 - Historic assets included in the EIA potentially subjected to construction effects Supporting documents · 11 Sept 2026 View ↗ PDF 2025-12-22 - ES Vol IV - Figure 6-29 - VP10 Glyndwr's Way_open access land to the west of Waun Dbubarthog Supporting documents · 11 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 5

Nutrient neutrality catchment: River Wye
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special area of conservation about 215 m away: River Wye / Afon Gwy (Wales)
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI about 215 m away: River Wye (Upper Wye) / Afon Gwy (Gwy Uchaf); Radon affected area, class 3.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Powys - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Powys
Application type
Development of National Significance
Received
11 Sept 2026
Validated
11 Sept 2026
Parish
Llangurig
Case officer
Show
Target decision
4 Dec 2026
Decision level
Delegated Decision
Applicant
Show
Agent
PEDW

Decision outlook

Day 28 of the 56-day target. Councils usually decide other by day 48.

Day 2828 days to the 56-day target
76%decided within 8 weeks
96%approved
1,669decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Powys to go on. Powys decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗