Solar and renewables in Powys

Powys received 63 renewable energy applications in the last 12 months, including 2 solar farms, 2 battery storage sites and 10 heat pumps. Of the 24 decided so far, 13 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Powys

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 25 of 25 applications
13 Nov 2026 Under Consultation P/26/1362/FUL

5 Belle Vue, Gungrog Road, Welshpool, SY21 7EJ

Installation of solar panels to existing property

Full planning permission Powys
12 Nov 2026 Under Consultation P/26/1313/LBC

Little House, Llandinam, SY17 5BH

Installation of Solar Panels to Existing Detached Garage within Listed Curitlage

LBC Powys
11 Nov 2026 Under Consultation P/26/1150/HH

Gelli, Meifod, SY22 6DL

Installation of a ground-mounted solar panel array

Householder planning permission Powys
9 Nov 2026 Under Consultation P/26/1142/FUL

Land to the East of the B4393, Llanfyllin, Powys , SY22 5LQ

Installation of 5MW Solar Farm with infrastructure including inverter station, substation, security fencing and CCTV and associated works

Full planning permission
6 Nov 2026 Under Consultation P/26/1334/FUL

Land at Melyniog Hall, Llansantffraid, Powys, SY22 6AX

Installation of a Biomass boiler within existing agricultural building and associated works

Full planning permission
4 Nov 2026 Valid P/26/1318/CLP

Murgwyn, Princes Avenue, Llandrindod Wells, LD1 5HU

Section 192 application for a lawful development certificate in relation to installation of solar panels on the roof

Lawful development Powys
2 Nov 2026 Valid P/26/1316/DNS

Aberedw Hill, 3km east of Builth Wells, Powys (Grid Ref: SO 09599 48767)

Representations should be submitted to pedw.infrastructure@gov.wales - Reference DNS CAS-03009-N5D9K8 : Construction and operation of Aberedw Energy ...

Development of National Significance
30 Oct 2026 Under Consultation P/26/1284/FUL

Building South of Swn yr Afon, Llangadfan, Welshpool, Powys, SY21 0PW

Installation of a biomass boiler

Full planning permission
29 Oct 2026 Under Consultation P/26/1277/FUL

Replacement wind turbine land 525 metres West of Derwllwydion, Llawr-Y-Glyn, Caersws, SY17 5RP

Erection of one 31.5m to hub (46m to tip) wind turbine (to replace existing turbine) with control box and all associated works

Full planning permission Powys
29 Oct 2026 Under Consultation P/26/1243/FUL

Unit 2, Dyfi Eco Park, Machynlleth, SY20 8AX

Installation of two air source heat pumps (ASHP) and battery energy storage system (BESS) together with associated works

Full planning permission Powys
23 Oct 2026 Valid P/26/1216/CLP

1 Hollybush House, Berriew Road, Welshpool, SY21 7SS

Certificate of Lawfulness application under Section 192 for proposed operation for installation of solar panels to rear elevation

Lawful development Powys
12 Oct 2026 Under Consultation P/26/1168/FUL

PANTIAU GWYNTOG , Cefn Coch, Llanrhaeadr-Ym-Mochnant , Powys, SY10 0BP

Change of use of land from equestrian to residential to include the erection of a timber cabin dwelling, a solar array, composting toilet, and greywat...

Full planning permission
8 Oct 2026 Under Consultation P/26/1078/LBC

Yr Hen Stabl, Felindre, Llanidloes, SY18 6PH

Erection of a freestanding solar array

LBC Powys
8 Oct 2026 Under Consultation P/26/1077/HH

Yr Hen Stabl, Felindre, Llanidloes, SY18 6PH

Erection of a freestanding solar array

Householder planning permission Powys
2 Oct 2026 Under Consultation P/26/1129/HH

17 Pencaemawr, Penegoes, Machynlleth, SY20 8PF

Erection of a detached building for use as garage & home gym with linked roof to property and relocation of ASHP

Householder planning permission Powys
1 Oct 2026 Approved 9 Nov P/26/0982/CLP

6 Brynteg, Llandrindod Wells, LD1 5HB

Section 192 application for a Lawful Development Certificate for the installation of solar panels on roof of property

Lawful development Powys
1 Oct 2026 Under Consultation P/26/1122/FUL

Trelowgoed Mill, Crossgates, Llandrindod Wells, LD1 5TT

Construction of a solar array and associated works

Full planning permission Powys
23 Sept 2026 Valid P/26/1107/SO

Land at Lodge Farm, Three Cocks, Brecon, LD3 0SW

Screening opinion under Regulation 6 of the Town & County Planning (Environmental Impact Assessment) (Wales) Regulations 2017 for a proposed solar far...

Screening Opinion Powys
22 Sept 2026 Under Consultation P/26/1056/FUL

Land at Dan Y Coed, Llanfair Caereinion, Welshpool, SY21 0BJ

Installation of ground mounted PV array with associated works

Full planning permission Powys
11 Sept 2026 Decided 14 Oct P/26/1000/DNS

1 km North of Llangurig - Banc Du, Powys

Representations should be submitted to pedw.infrastructure@gov.wales - Reference DNS CAS-01927-F0T2T1 : Up to six wind turbines (up to 39.6 MW) up to ...

Development of National Significance
10 Sept 2026 Under Consultation P/26/0856/FUL

Cringoed Isaf, Llanerfyl, Welshpool, SY21 0JG

Installation of ground Mounted Solar PV Scheme and associated works

Full planning permission Powys
1 Sept 2026 Under Consultation P/26/0929/FUL

Carnbwll, Four Crosses, Llanymynech, SY22 6SN

Erection of a Biomass building and associated works

Full planning permission Powys
27 Aug 2026 Under Consultation P/26/0867/LBC

Clematis, School Road, Guilsfield, Welshpool, SY21 9NQ

Demolition of an outbuilding and erection of replacement garage, installation of a ground source heat pump, ground-mounted solar panel array, internal...

LBC Powys
27 Aug 2026 Under Consultation P/26/0763/HH

Clematis, School Road, Guilsfield, Welshpool, SY21 9NQ

Demolition of existing lean-to garage outbuilding and erection of a replacement garage, together with the installation of a ground source heat pump, g...

Householder planning permission Powys
24 Aug 2026 Withdrawn 16 Oct P/26/0544/FUL

Community Centre and Premises, Owain Glyndwr Centre, 69 Maengwyn Street, Machynlleth, SY20 8EE

Repairs, alterations, improvements and upgrade of internal fabric including repairs to window, installation of additional toilets, lift, energy effici...

Full planning permission Powys
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Powys

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Powys?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Powys. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Powys's planning portal daily. New solar & renewables applications appear here within a day of being published.