2 Duck Street Elton Peterborough PE8 6RQ Data via plota.co.uk

26/01602/LBC - Listed Building Consent In progress

Proposal

Relocation of the air source heat pump and modifications to the associated domestic central heating and hot water system. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
1 Sept 2026
Consultation
3 Sept 2026
Decision
Expected by 27 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 27 Oct 2026 and 7 Nov 2026, from Huntingdonshire's recent listed building works. Comments are open until 30 Sept 2026.

Comment on this application ↗

Site constraints 7

Grade II listed: Number 2 and Attached Workshop to South
List entry 1317620 · 2 m from the pin · 10 more listed buildings within 150 m (10 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 10 with distances
Historic England ↗
Elton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Registered park or garden 146 m away: Elton Hall; Scheduled monument 187 m away: Earthworks of Abbot of Ramsey's Manor; Nature improvement area: Nene Valley; Inside the Elton (Huntingdonshire) built-up area; the 1970s provisional farmland map had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Huntingdonshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
PE8 6RQ
Received
1 Sept 2026
Validated
1 Sept 2026
Ward
Stilton, Folksworth And Washingley
Parish
Elton
Case officer
Show
Applicant
Show
Agent
Harris McCormack Architects

Decision outlook

Day 13 of the 56-day target. Huntingdonshire usually decides listed building works by day 62.

Day 1349 days to the predicted decision (day 62)
43%decided within 8 weeks
91%approved
53decided in the last year

Plota live figures for listed building works decided by Huntingdonshire in the last twelve months, from validation. Huntingdonshire decision record →

Public comments

No public comments yet.

2 neighbours consulted · Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14504242
Neighbours
2 Sept 2026
Consultation
3 Sept 2026
Comments by
30 Sept 2026
Site or press notice
9 Sept 2026
Env. assessment
No
Huntingdonshire
Planning Authority Score
3.9/10
Below average
#197 of 296 councils
Relevant to this application:
Other decisions

Huntingdonshire is slower than most councils at deciding householder applications, ranking #210 out of 296. 55% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Huntingdonshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #155 of 296
95%
Householder approved
Above avg (90%) #80 of 296
55%
Decided in 8 weeks
Below avg (63%) #210 of 296
55%
Extended time limit
Above avg (41%) #250 of 296
69%
Minor dwellings approved
175 decided (1-9 homes)
91%
Major dwellings approved
22 decided (10+ homes)
87%
Change of use approved
52 decided
1,077
Total decisions
125 refused in the year to March 2026