Solar and renewables in Huntingdonshire

Huntingdonshire received 40 renewable energy applications in the last 12 months, including 2 solar farms, 2 battery storage sites and 14 heat pumps. All 24 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

13
|
5
|
2
Get alerts for Huntingdonshire

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 13 of 13 applications
1 Oct 2026 In progress 26/70010/SCOP

Pathfinder House St Marys Street Huntingdon PE29 3TN

This application is not being determined by Huntingdonshire District Council. Planning Inspectorate Reference EN0110042. Planning Act 2008 (as amended...

Scoping Huntingdonshire
29 Sept 2026 In progress 26/70009/SCOP

Land At Chatteris Fen Chatteris Road Somersham

This application is not being determined by Huntingdonshire District Council - Planning Inspectorate Reference EN0110041 Planning Act 2008 (as amended...

Scoping Huntingdonshire
21 Sept 2026 In progress 26/01743/PSPPA

Units 13 And 14 Brookside Sawtry Huntingdon PE28 5SB

Installation and operation of a 181.09 kWp roof mounted solar PV system

Prior Approval Solar Photovoltaics Huntingdonshire
14 Sept 2026 In progress 26/01708/HHFUL

14 Wellington Street St Ives PE27 5AZ

Extensions and Alterations to Dwelling, Including Roof Alterations and Attic Conversion, Balcony, Solar Panels and Replacement Ancillary Building

Householder (Full) Huntingdonshire
11 Sept 2026 In progress 26/01595/CLPD

Waresley Cricket Club Manor Farm Road Waresley

Addition of black solar PV on the south facing roof of the pavillion

Certificate of Lawfulness proposed Huntingdonshire
4 Sept 2026 In progress 26/01497/HHFUL

Station House Priory Road St Ives PE27 5BB

Erection of PV solar shade

Householder (Full) Huntingdonshire
1 Sept 2026 In progress 26/01602/LBC

2 Duck Street Elton Peterborough PE8 6RQ

Relocation of the air source heat pump and modifications to the associated domestic central heating and hot water system.

Listed Building Consent Huntingdonshire
19 Aug 2026 In progress 26/01402/FUL

Beamglow Ltd Somersham Road St Ives PE27 3LP

Erection of Plant Room with 400kW biomass boiler (Retrospective).

Full Planning Application Huntingdonshire
12 Aug 2026 In progress 26/01461/HHFUL

15 Allens Orchard Brampton Huntingdon PE28 4NW

Erection of single storey side and rear extension, installation of Solar panels to roof, insertion of rooflights to entry porch and garage, and instal...

Householder (Full) Huntingdonshire
12 Aug 2026 In progress 26/01475/FUL

St James Church Church Street Hemingford Grey

Installation of Air Source Heat Pump west of the north aisle within a small timber fence enclosure.

Full Planning Application Huntingdonshire
6 Aug 2026 In progress 26/01416/HHFUL

Heathfield Benwick Road Ramsey Forty Foot Huntingdon PE26 2XU

Erection of two storey extension, barn and carport, internal and external alterations, new dormer and canopy roofs, and installation of solar PV panel...

Householder (Full) Huntingdonshire
5 Aug 2026 Approved 4 Sep 26/01423/PSPPA

3 - 4 Morley Court Enterprise Way Enterprise Park Yaxley

Solar PV installation on roof

Prior Approval Solar Photovoltaics Huntingdonshire
20 Jul 2026 In progress 26/01163/HHFUL

Vine Cottage The Green Winwick Huntingdon PE28 5PP

Proposed two storey rear extension to dwelling, conversion and ground floor extension to rear garage with first floor dormer roof over. Re-roofing, re...

Householder (Full) Huntingdonshire
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Huntingdonshire

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Huntingdonshire?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Huntingdonshire. You can also narrow the alert to a postcode, street, or drawn area.

We check Huntingdonshire's planning portal daily. New solar & renewables applications appear here within a day of being published.