Brook Barn, Church Lane, Warfield, Bracknell, RG42 6EG Data via plota.co.uk

PA/2026/0642 - Full planning permission Under Consultation

Proposal

Proposed demolition of existing agricultural buildings and erection of a replacement dwelling, together with associated access, landscaping, ecological enhancement and sustainable drainage infrastructure. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Jun 2026
Decision
Target date was 19 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 152.

The consultation period closed on 30 Jul 2026.

Documents 26

Application forms 2

PDF Commenter’s name hidden Show Community Infrastructure levy · 24 Jun 2026 View ↗
PDF Application Form Application form · 24 Jun 2026 View ↗

All documents on the council site ↗

Site constraints 3

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £1,335,000 in November 2019. Detached house, freehold.

18 November 2019£1,335,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area206 m² (2,217 sq ft)
Energy ratingC (79 out of 100), could reach B
PropertyDetached house
Built2018
HeatingBoiler and radiators, mains gas
WallsAverage thermal transmittance 0.17 W/m²K

From the energy performance certificate lodged in March 2019, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Bracknell Forest - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Postcode
RG42 6EG
Received
24 Jun 2026
Validated
24 Jun 2026
Ward
Binfield North & Warfield West
Parish
Warfield Parish Council
Case officer
Show
Target decision
19 Aug 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 152, past the statutory target. 77% of demolitions in Bracknell Forest are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 16 Nov 2026.

Day 15296 days past the 56-day target
19%decided within 8 weeks
92%approved
31decided in the last year

Plota live figures for demolitions decided by Bracknell Forest in the last twelve months, from validation. Bracknell Forest decision record →

Public comments

1comment received
1 supporting

Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
30 Jul 2026
Bracknell Forest
Planning Authority Score
2.4/10
Poor
#254 of 296 overall
Relevant to this application:
Householder decisions

Bracknell Forest is one of the slowest councils in England for householder decisions: #269 of 296 on speed. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bracknell Forest decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #125 of 296
92%
Householder approved
Above avg (90%) #147 of 296
38%
Decided in 8 weeks
Below avg (63%) #269 of 296
59%
Extended time limit
Above avg (41%) #263 of 296
81%
Minor dwellings approved
26 decided (1-9 homes)
79%
Major dwellings approved
14 decided (10+ homes)
83%
Change of use approved
30 decided
502
Total decisions
53 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.