Planning decisions in Bracknell Forest
How long Bracknell Forest takes to decide a planning application and how many it approves, from the 414 decisions it made in the twelve months to August 2026. Days run from validation to decision, the clock the council reports against; the wait from receipt is shown beside it. How the figures are made.
60 daysmedian from validation to decision (UK 52); 68 from receipt
44%decided within eight weeks (UK 73%), 80% within thirteen
90%approved (UK 89%): 309 approved, 35 refused, 24 withdrawn
307 of 321UK rank for speed; 183 of 321 for approvals
By kind of application
| Kind | Median days | Within 8 weeks | Approved | Decisions | UK rank |
|---|---|---|---|---|---|
| Full applications (including householder) | 63 | 39% | 97% | 167 | 271 of 302 |
| Tree works | 86 | 29% | 78% | 65 | 257 of 259 |
| Discharge of conditions | 59 | 42% | 96% | 49 | 166 of 175 |
| Lawful development certificates | 53 | 74% | 98% | 45 | 159 of 253 |
| Amendments * | 45 | 63% | 94% | 38 | 191 of 263 |
Delegated or committee
| Route | Share | Median days | Approved | Decisions |
|---|---|---|---|---|
| Delegated to officers | 99% | 60 | 90% | 409 |
| Planning committee | 1% | 80 | 80% | 5 |
Where the register states how the decision was made.
Appeals
49 appeals against Bracknell Forest decisions were decided by the Planning Inspectorate in the window, 140 for every 100 refusals; 33% were allowed. Every appeal in Bracknell Forest.
By year
| Year decided | Median days | Within 8 weeks | Approved | Decisions |
|---|---|---|---|---|
| 2026 so far | 68 | 33% | 90% | 413 |
Past their target date now
- Land At 572 London Road Blackwater Camberley SurreyApplication for advertisement consent for the display of signage for the new build Burger King unitdue 4 Feb 2026
- 190 Fernbank Road Ascot Berkshire SL5 8LAProposed single storey front, side and rear extensions, following demolition of conservatory. Addition of front entrance gate, boundary fencdue 4 Mar 2026
- 1 Edrich Grange Crowthorne Berkshire RG45 7FJRequest for confirmation of compliance with conditions for 1 Edrich Grange.due 5 Mar 2026
- Ivy Dene The Splash Warfield Bracknell Berkshire RG42 4SSDetails pursuant to condition 5 (surface water drainage) of planning permission 18/00973/FUL.due 9 Mar 2026
- 102 Nuthurst Bracknell Bracknell Forest RG12 0UWChange of use from amenity land to private gardendue 12 Mar 2026
- Continuity House London Road Bracknell Berkshire RG12 2XHDetails pursuant to condition 13 (CEMP) of planning permission 20/01083/FUL.due 17 Mar 2026
- Old Oak Farm Old Oak Court West Road Wokingham Berkshire RG40 3DLListed building application for a proposed log burner and replacement windows to side elevation.due 18 Mar 2026
- Haldane House Nursing Home 127 Yorktown Road Sandhurst Berkshire GU47 9BWProposed 2.5 storey rear and single storey side extensions, front extension with internal alterations.due 18 Mar 2026
Decided in the last three weeks
- FERNHILL COTTAGE, HATCHET LANE, WINKFIELD, WINDSOR, SL4 2DZProposed infill extension below existing first floor overhang to rear, replacement of first floor walls on overhang and the addition of porcApproved11 Sept 2026
- 4 BROOKSIDE, SANDHURST, GU47 9AFApplication for a certificate of lawfulness for the proposed single-storey rear extension, front porch, and associated internal/external worApproved10 Sept 2026
- 5 SETLEY WAY, BRACKNELL, RG12 9FFRetrospective application for a garage conversionApproved10 Sept 2026
- 44 MICKLE HILL, SANDHURST, GU47 8QPProposed single storey front extension.Approved10 Sept 2026
- 50 GAINSBOROUGH, BRACKNELL, RG12 7WLProposed erection of a ground floor rear extension with conversion of existing garage into a habitable spaceApproved10 Sept 2026
- KEILDON, BEEHIVE ROAD, BINFIELD, BRACKNELL, RG12 8TRProposed replacement of flat roof over single storey front projection with a pitched roof.Approved10 Sept 2026
- HYDER COTTAGE, 1 ST JOHNS ROAD, SANDHURST, GU47 9ADProposed single storey rear extension and internal alterations.Approved10 Sept 2026
- 57 CAMBRIDGE ROAD, CROWTHORNE, RG45 7EPProposed first floor roof and 2 storey rear extensions, outbuilding to rear of garden and dropped kerb to front.Approved9 Sept 2026
Built nightly from Bracknell Forest's planning register. Ranks are among the 321 published councils. See planning applications in Bracknell Forest, appeals, or get alerts for Bracknell Forest.
About these figures
How are decision times measured?
Days from the date the council validated the application to the date it decided it, for applications approved or refused in the window. That is the clock councils report against and the official statistics use. Each council’s page also shows the count from receipt, which is what the applicant actually waited. Withdrawn and undecided applications are not timed.
Why do these figures differ from the council’s own?
Councils count an agreed extension of time as decided on time; we treat the calendar as the calendar. Our figures are also live and rolling, where official statistics are quarterly and annual. So a council’s own within-eight-weeks figure will usually sit a little above ours.
What counts as approved?
Approval rate is approvals divided by approvals plus refusals. Withdrawals, and decisions whose outcome the register does not state, are counted in the totals but not in the rate.
Why is a council missing?
A council is published when it has at least 25 timed decisions in the window and its register’s decision data passes our consistency checks. Councils that fail are listed with the reason rather than shown with a number that would mislead.
How often is this updated?
Nightly, from the decisions we collect from every council register we monitor. The window is the twelve months to the last complete month.