5 Oakwood Close Otterbourne Winchester Hampshire SO21 2EB Data via plota.co.uk

25/00330/TPO - Tree Preservation Order Approved

Proposal

We are applying to seek approval to reduce the overall weight of Holm Oak Tree in our rear garden to the right as looking from the house. This is to reduce the overall weight overhanging in our garden and the overall weight of the tree to one side. The base of the tree is leaning & has broke the base wall so we have concerns and have had those from a tree surgeon shared it could be at risk of falling in time. We have had previously very large branches fall into our garden thankfully to no personal harm as yet. Reduction will ensure safety for the long term health of the tree and for us as a family in our garden. It will also improve the overall balance of the tree and light reaching our garden. As an evergreen the tree significantly diminishes the amount of light and quality to our garden however we do not wish to fell this tree. We have sought advice from tree surgeon who has also advised this tree would significantly benefit from reduction. We would like to consider no more than 1.5 - 2 meters (10%) from the crown focussed more to the top & right-hand side of the tree as you see from the picture below to balance and allow light. The tree branches start to widen out from the base of the tree approx. 4-5m from the ground and we would like to prune lower tertiary branches no greater than 25mm & 5m. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Feb 2025
✓
Validated
18 Feb 2025
✓
Approved
15 Apr 2025

Approved on 15 Apr 2025 · Delegated Decision · Last checked 16 Nov 2026

Documents 6

Consultation & comments 2

PDF Supporter’s name hidden Show Public Comment · 27 Feb 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 19 Feb 2025 View ↗

All documents on the council site ↗

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 378 m away: Hampshire Water Transfer and Water Recycling Project
The site is 378 m from the project boundary. Dam or reservoir, accepted for examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 3; Inside the Otterbourne built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 9 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £675,000 in January 2021. Detached house, freehold.

8 January 2021£675,000
28 May 2010£452,000
4 October 2001£210,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area180 m² (1,938 sq ft)
Energy ratingD (63 out of 100), could reach C
PropertyDetached house, 9 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in January 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Winchester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Winchester
Application type
Tree Preservation Order
Postcode
SO21 2EB
Received
17 Feb 2025
Validated
18 Feb 2025
Ward
BADGER FARM AND OLIVERS BATTERY WARD
Parish
Otterbourne Parish Council
Case officer
Show
Target decision
15 Apr 2025
Decision
Application Permitted
Decision date
15 Apr 2025
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 56 days from validation, 5 days slower than Winchester's median of 51 for tree and landscaping works. Approved, as 98% of tree and landscaping works here are.

60%decided within 8 weeks
98%approved
534decided in the last year

Plota live figures for tree and landscaping works decided by Winchester in the last twelve months, from validation. Winchester decision record →

Consultation & key dates

Alt. reference
PP-13221259
Planning Portal ref
PP-13221259
Statutory expiry
15 Apr 2025
Env. assessment
No
Winchester
Planning Authority Score
4.5/10
Below average
#177 of 296 overall
Relevant to this application:
Householder decisions

Winchester is slower than most councils at deciding householder applications: #213 of 296 on speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (97%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Winchester decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #72 of 296
97%
Householder approved
Above avg (90%) #47 of 296
55%
Decided in 8 weeks
Below avg (63%) #213 of 296
50%
Extended time limit
Above avg (41%) #230 of 296
70%
Minor dwellings approved
63 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
88%
Change of use approved
32 decided
918
Total decisions
60 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.