Market Towers, 1 Nine Elms Lane, SW8 Data via plota.co.uk

2025/1644 - Matters relating to a S106 Agreement Approved

Proposal

Matters relating to a S106 Agreement in respect of the written evidence of the transfer or lease of the Affordable Housing Units required under Schedule 3, Part 1, Paragraphs 4 (b), 5 (b), and 6 (b) of the S106 Agreement associated with planning permission ref: dated 19/07/23 (Deed of Variation to the S106 Legal Agreement of the planning permission (as amended) dated 26th August 2014 for minor-material amendments, under Section 73 of the Town and Country Planning Act, to planning permission "Demolition of existing buildings and structures. Erection of two new buildings of 58 storeys (up to 200m above ground) and 43 storeys (up to 161m above ground) high to provide up to 494 residential units, retail uses (classes A1-A4); a hotel (class C1) together with a high level viewing space; provision of private and public open spaces; vehicular access and reconfigured vehicular access routes; provision of cycle, motorcycle and car parking, servicing and energy centre within the two level basement; landscaping; excavation works; and other associated works".). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 May 2025
✓
Validated
19 Jun 2025
✓
Approved
9 Sept 2026

Approved on 9 Sept 2026 · Delegated Standard · Last checked 22 Nov 2026

Site constraints 17

Single TPOVauxhall/Nine Elms/Battersea Opportunity Area (Core Strategy)Site Specific Allocations (DMPD&SSAD)Surface water flood riskHeliport CAA Height RestrictionsFocal Points of Activity (Core Strategy & DMPD)
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 352 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Wandsworth AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Single TPOCouncil record
Recorded by the council for this site.
Council site ↗
Vauxhall/Nine Elms/Battersea Opportunity Area (Core Strategy)Council record
Recorded by the council for this site.
Council site ↗
Site Specific Allocations (DMPD&SSAD)Council record
Recorded by the council for this site.
Council site ↗
Surface water flood riskCouncil record
Recorded by the council for this site.
Council site ↗
Heliport CAA Height RestrictionsCouncil record
Recorded by the council for this site.
Council site ↗
Focal Points of Activity (Core Strategy & DMPD)Council record
Recorded by the council for this site.
Council site ↗
Also on the record
3 listed buildings within 150 m of the postcode pin; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Conservation area about 98 m away: Albert Embankment; Town centre about 48 m away: Vauxhall.
Not affected
Not green belt · No scheduled monument at the site

Checked on 9 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wandsworth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wandsworth
Application type
Matters relating to a S106 Agreement
Received
8 May 2025
Validated
19 Jun 2025
Ward
Nine Elms, Queenstown - Historic
Case officer
Show
Target decision
3 Jul 2025
Decision
Approve No Conditions
Decision date
9 Sept 2026
Decision level
Delegated Standard
Applicant
Show
Agent
Montagu Evans LLP

How this decision compares

Decided in 447 days from validation, 397 days slower than Wandsworth's median of 50 for section 106 and planning obligations. Approved, as 100% of section 106 and planning obligations here are.

53%decided within 8 weeks
100%approved
58decided in the last year

Plota live figures for section 106 and planning obligations decided by Wandsworth in the last twelve months, from validation. Wandsworth decision record →

Consultation & key dates

Statutory expiry
10 Jul 2025
Wandsworth
Planning Authority Score
4.8/10
Below average
#164 of 296 overall
Relevant to this application:
Householder decisions

Wandsworth is #172 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Wandsworth decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #120 of 296
92%
Householder approved
Above avg (90%) #168 of 296
62%
Decided in 8 weeks
Below avg (63%) #172 of 296
37%
Extended time limit
Below avg (41%) #124 of 296
89%
Minor dwellings approved
680 decided (1-9 homes)
81%
Major dwellings approved
16 decided (10+ homes)
72%
Change of use approved
36 decided
2,062
Total decisions
206 refused in the year to March 2026