The Greyhound Inn, 20 Sutton Stop, Coventry, CV6 6DF Data via plota.co.uk
Proposal
Installation of a new electricity substation on land owned by the Canal & River Trust, together with associated electrical infrastructure, transformer, switchgear, underground cabling, service connections, ducting, security fencing, access and all associated engineering works, including the diversion and undergrounding of existing overhead electricity lines, to improve the resilience of the local electricity network and facilitate the future redevelopment of the adjoining Greyhound Public House site. Including work within the outside barn and meter housing as approved under . Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision around 24 Nov 2026, from Coventry's recent commercial and major works.
Documents 12
Statements & assessments 2
Plans & drawings 7
Application forms 1
Associated applications 3
- Installation of a new electricity substation on land owned by the Canal & River Trust, together with associated electrical…
Site constraints 8
Show the other 4 with distances
- 27 m4-14, Sutton StopGrade II
- 46 mFootbridge Over Junction of Coventry and Oxford CanalsGrade II
- 93 mRoving Bridge Over Oxford CanalGrade II
- 111 mEngine HouseGrade II
Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Coventry - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Nearby new applications
Land Rear Of, Elmore Parrotts Grove, Coventry
Consultation from Nuneaton and Bedworth Borough Council for planning application...
124 Blackhorse Road, Longford, Bedworth, Coventry, Warwickshire, CV6 6DL
First floor extension to front.
The Greyhound Inn, 20 Sutton Stop, Coventry, CV6 6DF
Listed Building Consent for works to the Greyhound Pub and outbuildings within t...
Important details
Decision outlook
Day 55 of the 56-day target. Coventry usually decides commercial and major works by day 56.
Plota live figures for commercial and major works decided by Coventry in the last twelve months, from validation. Coventry decision record →
Consultation & key dates
- Statutory expiry
- 24 Nov 2026
Historical activity at this location
17 nearby applications on record - archival context, not part of the live application.
Nearby activity
Coventry is one of the fastest councils in England for householder decisions: #13 of 296 on speed. Only 13% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).
Track this application
The Greyhound Inn, 20 Sutton Stop, Coventry, CV6 6DF
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Referenced application
Council archive
Flat Above, Greyhound Inn, 20 Sutton Stop, Coventry, CV6 6DF
Construction of new (rendered) electricity meter housing for upgraded 3 phase incoming mains supply; including removal of overhead cables and associated groundworks to rear of building. Construction of new GRP (Western Power) Sub station to be situated behind the rear storage building within stone car park to enable upgrade of electricity network. Minor alterations to paving adjacent to new Meter Housing.
- Received
- 27 Nov 2019
- Decided
- 11 Jun 2020
- Outcome
- Approved
- Type
- Heritage
