The Greyhound Inn, 20 Sutton Stop, Coventry, CV6 6DF Data via plota.co.uk
Proposal
Listed Building Consent for works to the Greyhound Pub and outbuildings within the curtilage in association with the installation of a new electricity substation and enabling works on land owned by the Canal & River Trust. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision around 23 Nov 2026, from Coventry's recent utility and infrastructure works.
Documents 12
Statements & assessments 1
Plans & drawings 6
Application forms 2
Associated applications 3
- Listed Building Consent for works to the Greyhound Pub and outbuildings within the curtilage in association…
Site constraints 8
Show the other 4 with distances
- 28 mThe Greyhound InnGrade II
- 63 mFootbridge Over Junction of Coventry and Oxford CanalsGrade II
- 139 mRoving Bridge Over Oxford CanalGrade II
- 149 mEngine HouseGrade II
Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Coventry - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Nearby new applications
124 Blackhorse Road, Longford, Bedworth, Coventry, Warwickshire, CV6 6DL
First floor extension to front.
The Greyhound Inn, 20 Sutton Stop, Coventry, CV6 6DF
Installation of a new electricity substation on land owned by the Canal & River ...
163 Blackhorse Road, Longford, Bedworth, Coventry, Warwickshire, CV6 6DG
Proposed Subdivision and Change of Use from dwellinghouse (Class C3) to retail C...
Important details
Decision outlook
Day 30 of the 56-day target. Coventry usually decides utility and infrastructure works by day 55.
Plota live figures for utility and infrastructure works decided by Coventry in the last twelve months, from validation. Coventry decision record →
Consultation & key dates
- Statutory expiry
- 24 Nov 2026
Historical activity at this location
17 nearby applications on record - archival context, not part of the live application.
Nearby activity
Coventry is one of the fastest councils in England for householder decisions, ranking #13 out of 296. Only 13% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).
Track this application
The Greyhound Inn, 20 Sutton Stop, Coventry, CV6 6DF
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Council archive
Flat Above, Greyhound Inn, 20 Sutton Stop, Coventry, CV6 6DF
Construction of new (rendered) electricity meter housing for upgraded 3 phase incoming mains supply; including removal of overhead cables and associated groundworks to rear of building. Construction of new GRP (Western Power) Sub station to be situated behind the rear storage building within stone car park to enable upgrade of electricity network. Minor alterations to paving adjacent to new Meter Housing.
- Received
- 27 Nov 2019
- Decided
- 11 Jun 2020
- Outcome
- Approved
- Type
- Heritage
