Land to the Rear of 7 to 9 , High Street , Buxton , Derbyshire , Data via plota.co.uk

HPK/2026/0227 - Full - Householder Consultations/Re-consultations issued

Proposal

Proposed erection of domestic garage and store room and demolition of existing domestic garage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Jun 2026
✓
Validated
24 Aug 2026
Decision
Target date was 19 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 30 Nov 2026; it is now day 91.

Comments are open until 30 Nov 2026

Comment on this application ↗

Site constraints 7

Nutrient neutrality catchment: Peak District Dales SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Buxton Central conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Public footpath about 18 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
5 listed buildings within 150 m of the postcode pin; Registered park or garden about 191 m away: Pavilion Gardens, Buxton; Inside the Buxton (High Peak) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in High Peak - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
High Peak
Application type
Full - Householder
Postcode
SK17 6ET
Received
9 Jun 2026
Validated
24 Aug 2026
Case officer
Show
Target decision
19 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
ROBERT L FORD

Decision outlook

Day 91, past the statutory target. 73% of extensions in High Peak are decided within thirteen weeks, which runs to 23 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 918 days to the predicted decision (day 99)
35%decided within 8 weeks
88%approved
181decided in the last year

Plota live figures for extensions decided by High Peak in the last twelve months, from validation. High Peak decision record →

Consultation & key dates

Consultation
10 Sept 2026
Comments by
30 Nov 2026
High Peak
Planning Authority Score
1.2/10
Poor
#287 of 296 overall
Relevant to this application:
Householder decisions

High Peak is one of the slowest councils in England for householder decisions: #284 of 296 on speed. The council extends the time limit on 73% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
High Peak decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #207 of 296
89%
Householder approved
Below avg (90%) #204 of 296
29%
Decided in 8 weeks
Below avg (63%) #284 of 296
73%
Extended time limit
Above avg (41%) #291 of 296
78%
Minor dwellings approved
32 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
89%
Change of use approved
18 decided
364
Total decisions
55 refused in the year to March 2026