LEA BRIDGE Lea Bridge Road, Hackney Data via plota.co.uk

2026/2245 - Full Planning Permission Consultation/Publicity

Proposal

Proposed installation of a services pedestal to a serve a community boat mooring on the Lea Navigation. Proposed installation of floating wildlife garden pontoons on the River Lea Navigation adjacent to the existing community boat / mooring. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Oct 2026
✓
Validated
23 Oct 2026
Decision
Expected by 18 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 26 Dec 2026 and 20 Jan 2027, from Hackney's recent utility and infrastructure works.

Site constraints 14

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Lea Bridge conservation area
Also Lea Bridge. Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Whole of the London Borough of Hackney. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Archaeological priority area: Hackney APA 3.1 Lea Valley
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hackney AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
1 listed building within 150 m; Flood defence 4 m away (natural high ground, designed for a 1 in 25 year flood); Heritage at risk 60 m away: Premises of Testi and Sons Millwrights, Waterworks Lane; SSSI 471 m away: Walthamstow Reservoirs SSSI; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Metropolitan Open Land 5 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hackney - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hackney
Application type
Full Planning Permission
Received
22 Oct 2026
Validated
23 Oct 2026
Ward
Lea Bridge Ward
Case officer
Show
Target decision
18 Dec 2026
Decision level
Delegated
Applicant
Show
Agent
Fabric Space

Decision outlook

Day 19 of the 56-day target. Hackney usually decides utility and infrastructure works by day 81.

Day 1962 days to the predicted decision (day 81)
31%decided within 8 weeks
86%approved
89decided in the last year

Plota live figures for utility and infrastructure works decided by Hackney in the last twelve months, from validation. Hackney decision record →

Consultation & key dates

Statutory expiry
18 Dec 2026
Hackney
Planning Authority Score
2.4/10
Poor
#256 of 296 councils
Relevant to this application:
Householder decisions

Hackney is slower than most councils at deciding householder applications, ranking #220 out of 296. Hackney is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hackney decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #248 of 296
84%
Householder approved
Below avg (90%) #257 of 296
53%
Decided in 8 weeks
Below avg (63%) #220 of 296
46%
Extended time limit
Above avg (41%) #201 of 296
75%
Minor dwellings approved
204 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
50%
Change of use approved
2 decided
1,323
Total decisions
241 refused in the year to March 2026