28 Dunrobin Place Edinburgh EH3 5HZ Data via plota.co.uk

25/04545/LBC - Listed Building Consent Approved

Proposal

Replace the existing single glazed sash and case windows with double glazed upgrades. Full restoration of the original case, manufacture and install like-for-like sashes with Heritage 'Slimlite' double glazing. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Sept 2025
✓
Approved
23 Oct 2025

Approved on 23 Oct 2025 · Delegated Decision · Last checked 30 Oct 2026

Site constraints 4

Grade B listed: 3, 28 Dunrobin Place, Glenogle Road, Edinburgh
List entry LB50519 · 0 m away · 21 more listed buildings within 150 m (3 Grade A, 18 Grade B)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 21 with distances
Historic Environment Scotland ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Stockbridge Colonies conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Registered park or garden 24 m away: The New Town Gardens
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic Environment Scotland ↗
Not affected
No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Edinburgh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Edinburgh
Application type
Listed Building Consent
Postcode
EH3 5HZ
Received
3 Sept 2025
Validated
3 Sept 2025
Ward
Inverleith
Parish
Stockbridge + Inverleith
Case officer
Show
Target decision
2 Nov 2025
Decision
Granted
Decision date
23 Oct 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Alistair Jamieson.

How this decision compares

Decided in 50 days from validation, 7 days faster than Edinburgh's median of 57 for listed building works. Approved, as 93% of listed building works here are.

47%decided within 8 weeks
93%approved
1,109decided in the last year

Plota live figures for listed building works decided by Edinburgh in the last twelve months, from validation. Edinburgh decision record →

Public comments

No public comments yet.

Last counted 30 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
6 Oct 2025
Statutory expiry
2 Nov 2025
Env. assessment
No