Former Coal Yard Ferrybridge 'C' Power Station Kirkhaw Lane Knottingley Ferrybridge WF11 8RD Data via plota.co.uk

23/00100/SUB29 - Discharge of Conditions Request Awaiting decision

Proposal

Application to Discharge Condition 11(Construction Environmental Management Plan (CEMP)); Condition 12 (Construction Traffic Management Plan (CTMP)); Condition 21 (temporary surface water drainage); Condition 23 (foul and surface water drainage); Condition 29 (works adjacent A1(M)); Condition 38 (remediation strategy and verification plan); and Condition 40 (gas protection measures) for development Zone A of Planning Permission Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Jul 2026
✓
Consultation
21 Aug 2026
Decision
Expected by 27 Oct 2026

Under consideration

No decision has been issued yet. A decision is expected by 27 Oct 2026.

The consultation period closed on 11 Sept 2026.

Documents 32

All documents on the council site ↗

Associated applications 20

Site constraints 5

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project about 320 m away: Ferrybridge Multifuel 2 (FM2) Power Station
The site is about 320 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Knottingley Power Project (decided, about 1733 m); Ferrybridge Next Generation Power Station (at pre-application, the site is inside its boundary); Ferrybridge Carbon Capture and Storage (at pre-application, about 483 m); East Coast Hydrogen Humber Pipeline (at pre-application, about 484 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Coalfield, development low risk area; Inside the Holmfield built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wakefield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wakefield
Application type
Discharge of Conditions Request
Postcode
WF11 8RD
Received
7 Jul 2026
Validated
7 Jul 2026
Ward
Knottingley
Case officer
Show
Target decision
27 Oct 2026
Applicant
Show
Agent
Savills

Public comments

No public comments yet.

Last counted 3 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15057090
Planning Portal ref
PP-15057090
Consultation
21 Aug 2026
Comments by
11 Sept 2026
Site or press notice
23 Jul 2026
Statutory expiry
27 Oct 2026
Env. assessment
No
Wakefield
Planning Authority Score
3.6/10
Below average
#217 of 296 councils
Relevant to this application:
Householder decisions

Wakefield is slower than most councils at deciding householder applications, ranking #223 out of 296. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wakefield decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #95 of 296
95%
Householder approved
Above avg (90%) #94 of 296
53%
Decided in 8 weeks
Below avg (63%) #223 of 296
56%
Extended time limit
Above avg (41%) #256 of 296
89%
Minor dwellings approved
79 decided (1-9 homes)
92%
Major dwellings approved
24 decided (10+ homes)
85%
Change of use approved
74 decided
1,084
Total decisions
88 refused in the year to March 2026