Former Coal Yard, Ferrybridge 'C' Power Station Kirkhaw Lane Knottingley Ferrybridge Data via plota.co.uk

23/00100/REM04 - Approval of Reserved Matters Approved

Proposal

Approval of Reserved Matters pursuant to (Internal Access, Appearance, Landscaping, Layout, and Scale) at Development Zone B for the erection of one B8 (Storage and Distribution Unit) (Unit 3A) with associated ancillary structures, plant, boundary enclosures, vehicle parking, hard and soft landscaping, and associated external works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Oct 2025
✓
Validated
14 Oct 2025
✓
Consultation
5 Jun 2026
✗
Appeal dismissed
30 Jun 2026
✓
Approved
9 Jul 2026

Approved on 9 Jul 2026 · Delegated Decision · Last checked 17 Oct 2026

Documents 31

All documents on the council site ↗

Site constraints 5

National infrastructure project about 144 m away: Ferrybridge Multifuel 2 (FM2) Power Station
The site is about 144 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Ferrybridge Next Generation Power Station (at pre-application, the site is inside its boundary); Ferrybridge Carbon Capture and Storage (at pre-application, about 91 m); East Coast Hydrogen Humber Pipeline (at pre-application, about 1130 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Coalfield, development low risk area; Scheduled monument about 248 m away: Ferrybridge Henge, a prehistoric enclosure, and two round barrows; Inside the Holmfield built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 11 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wakefield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wakefield
Application type
Approval of Reserved Matters
Received
9 Oct 2025
Validated
14 Oct 2025
Ward
Knottingley
Case officer
Show
Target decision
10 Jul 2026
Decision
Application Approved
Decision date
9 Jul 2026
Decision level
Delegated Decision
Appeal
Dismissed · 30 Jun 2026 · Written Representations · Inspectorate case 6005309 ↗
Applicant
Show
Agent
Oxalis Planning Ltd

How this decision compares

Decided in 268 days from validation, 176 days slower than Wakefield's median of 92 for reserved matters. Approved, as 96% of reserved matters here are.

27%decided within 8 weeks
96%approved
12%go to committee

Plota live figures for reserved matters decided across the UK in the last twelve months, from validation; too few recent reserved matters in Wakefield to go on. Wakefield decision record →

Public comments

No public comments yet.

Last counted 17 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14302123
Planning Portal ref
PP-14302123
Consultation
5 Jun 2026
Comments by
26 Jun 2026
Site or press notice
7 Nov 2025
Statutory expiry
3 Feb 2026
Env. assessment
No
Wakefield
Planning Authority Score
3.6/10
Below average
#217 of 296 councils
Relevant to this application:
Major dwellings

Wakefield is slower than most councils at deciding householder applications, ranking #223 out of 296. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wakefield decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #95 of 296
95%
Householder approved
Above avg (90%) #94 of 296
53%
Decided in 8 weeks
Below avg (63%) #223 of 296
56%
Extended time limit
Above avg (41%) #256 of 296
89%
Minor dwellings approved
79 decided (1-9 homes)
92%
Major dwellings approved
24 decided (10+ homes)
85%
Change of use approved
74 decided
1,084
Total decisions
88 refused in the year to March 2026