Former Coal Yard, Ferrybridge 'C' Power Station Kirkhaw Lane Ferrybridge Knottingley Data via plota.co.uk

23/00100/NMC06 - Non Material Amendment 06 Awaiting decision

Proposal

Non-material amendment to application number 23/00100/REM04 Approval of Reserved Matters pursuant to (Internal Access, Appearance, Landscaping, Layout, and Scale) at Development Zone B for the erection of one B8 (Storage and Distribution Unit) (Unit 3A) with associated ancillary structures, plant, boundary enclosures, vehicle parking, hard and soft landscaping, and associated external works to reduce the ride height of the building by 2 metres and changes to the external appearance of the building and layout of the development Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Oct 2026
Decision
Expected by 24 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 24 Nov 2026.

Site constraints 5

National infrastructure project 350 m away: Ferrybridge Multifuel 2 (FM2) Power Station
The site is 350 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Knottingley Power Project (decided, 2 km); Ferrybridge Next Generation Power Station (at pre-application, the site is inside its boundary); Ferrybridge Carbon Capture and Storage (at pre-application, 426 m); East Coast Hydrogen Humber Pipeline (at pre-application, 888 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Scheduled monument 167 m away: Ferrybridge Henge, a prehistoric enclosure, and two round barrows; Radon affected area, class 2; Coalfield, development low risk area; Inside the Holmfield built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 4 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wakefield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wakefield
Application type
Non Material Amendment 06
Received
27 Oct 2026
Validated
27 Oct 2026
Ward
Knottingley
Parish
Knottingley
Case officer
Show
Target decision
24 Nov 2026
Applicant
Show
Agent
Oxalis Planning Ltd

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15324675
Planning Portal ref
PP-15324675
Statutory expiry
24 Nov 2026
Env. assessment
No
Wakefield
Planning Authority Score
3.6/10
Below average
#217 of 296 overall
Relevant to this application:
Householder decisions

Wakefield is slower than most councils at deciding householder applications: #223 of 296 on speed. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wakefield decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #95 of 296
95%
Householder approved
Above avg (90%) #94 of 296
53%
Decided in 8 weeks
Below avg (63%) #223 of 296
56%
Extended time limit
Above avg (41%) #256 of 296
89%
Minor dwellings approved
79 decided (1-9 homes)
92%
Major dwellings approved
24 decided (10+ homes)
85%
Change of use approved
74 decided
1,084
Total decisions
88 refused in the year to March 2026