Ivy House Farm Long Lane Woodmansey East Riding Of Yorkshire HU17 0RN Data via plota.co.uk

26/03082/DEMNOT - Demolition Prior Approval Pending Consideration

Proposal

Demolition of two agricultural barns (Barn 1 and Barn 2) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Nov 2026
✓
Validated
12 Nov 2026
Decision
Expected by 10 Dec 2026
Appeal
Appeal decided

Under consideration

No decision has been issued yet. Plota predicts a decision between 10 Dec 2026 and 3 Jan 2027, from East Riding's recent agricultural works.

Comments are open until 7 Dec 2026

Comment on this application ↗

Site constraints 3

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 237 m away: Peartree Hill Solar Farm
The site is 237 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Dogger Bank Creyke Beck (decided, 304 m); Dogger Bank South Offshore Wind Farms (decided, 1.6 km); Hornsea Project Four Offshore Wind Farm (decided, 1.7 km); Dogger Bank D Wind Farm (at pre-application, 365 m); East Coast Hydrogen Humber Pipeline (at pre-application, 1.3 km); Clean Air Solar Farm (at pre-application, 1.5 km); North Humber to High Marnham (at pre-application, 1.6 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Public footpath 29 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 14 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area56 m² (603 sq ft)
Energy ratingA (asset rating 18)
UseOffices and Workshop Businesses
HeatingAir Conditioning

From the energy performance certificate lodged in February 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Demolition Prior Approval
Postcode
HU17 0RN
Received
11 Nov 2026
Validated
12 Nov 2026
Ward
Minster And Woodmansey
Parish
Woodmansey Parish Council
Case officer
Show
Target decision
10 Dec 2026
Applicant
Show
Agent
Twenty5 Planning Limited

Decision outlook

Day 11 of the 56-day target. East Riding usually decides agricultural works by day 43.

Day 1145 days to the 56-day target
85%decided within 8 weeks
87%approved
142decided in the last year

Plota live figures for agricultural works decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15358143
Planning Portal ref
PP-15358143
Comments by
7 Dec 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 overall
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions: #7 of 296 on speed. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.