Tir Ger / Land By Muriau Park Hotel, Ffordd Bont Saint, Caernarfon, Gwynedd, LL55 2YS Data via plota.co.uk

C24/0323/14/LL - Full Planning Refused

Proposal

Gorsaf betrol arfaethedig, hwb gwefru ceir trydan, adeilad manwerthu, chreu mynedfa newydd a gwaith cysylltiedig gan gynnwys tirlunio. Proposed petrol filling station, electric vehicle charging hub, retail building and creation of new access and associated works to include landscaping. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Apr 2024
✓
Validated
31 Jul 2024
✗
Refused
28 Sept 2026
Appeal
Not lodged

Refused on 28 Sept 2026 · Pwyllgor Cynllunio / Planning Committee · Last checked 31 Oct 2026

Planning committee

Decided by Gwynedd Planning Committee on 28 Sept 2026.

Refused

  • Officers advised refusal because of disturbance, biodiversity, drainage, contamination, flooding, agricultural land and retail concerns.
  • Councils and residents raised concerns about the location, traffic, safety, landscape, pollution, biodiversity and effects on local businesses.
  • The committee proposed and resolved to refuse the application on eight stated grounds.

Source: Plota analysis of Gwynedd's committee minutes, Gwynedd Planning Committee minutes, 28 September 2026 .

Documents 27

All documents on the council site ↗

Site constraints 3

Nutrient neutrality catchment: Afon Gwyrfai
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for an EV charging hub?

Plota Sites searches every land parcel in England and Wales: 258 sites fit this search. On and off the market, free to search.

Land for EV charging hubs
Work with planning data?

Every application in Gwynedd - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gwynedd
Application type
Full Planning
Postcode
LL55 2YS
Received
22 Apr 2024
Validated
31 Jul 2024
Ward
Canol Tref Caernarfon
Parish
Caernarfon
Case officer
Show
Target decision
28 Jul 2026
Decision
Refused
Decision date
28 Sept 2026
Decision level
Pwyllgor Cynllunio / Planning Committee
Applicant
Show
Agent
Cadnant Planning

How this decision compares

Decided in 789 days from validation, 642 days slower than Gwynedd's median of 147 for full applications. Refused, as 17% of full applications here are.

13%decided within 8 weeks
83%approved
13%go to committee

Plota live figures for full applications decided by Gwynedd in the last twelve months, from validation. Gwynedd decision record →

Consultation & key dates

Comments by
14 Jul 2026
Statutory expiry
28 Jul 2026