Sika House Verwood Road Three Legged Cross BH21 6RJ Data via plota.co.uk

P/TRT/2026/04537 - Tree Works- TPO Pending

Proposal

T1 Oak - Crown lift to a height of 6 metres from ground level by removal of secondary and tertiary branches only. - Reduce lateral branches on the southern side to give a maximum clearance from the house of 2.5 metres. - Crown thin by up to 20% concentrating on branch ends with a cut diameter not exceeding 40 mm. T2 Oak - Crown lift to a height of 6 metres from ground level by removal of secondary and tertiary branches only. - Reduce lateral branches on the southern side to give a maximum clearance from the house of 2.5 metres. - Crown thin by up to 20% concentrating on branch ends with a cut diameter not exceeding 40 mm. T3 Oak - Reduce lateral branches on the southern side to give a maximum clearance from the house of 2.5 metres. Data via plota.co.uk

View original council record ↗

Application progress

Received
19 Aug 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet. Comments are open until 10 Sept 2026.

Comment on this application ↗

Important details

Council
Dorset
Application type
Tree Works- TPO
Postcode
BH21 6RJ
Received
19 Aug 2026
Validated
19 Aug 2026
Ward
West Moors and Three Legged Cross Ward
Parish
Verwood
Case officer
Show
Decision level
Delegated
Applicant
Show
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 councils
Relevant to this application:
Householder decisions

Dorset is faster than most councils at deciding householder applications, ranking #51 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision performance
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026