Cambridge Business Park Cowley Road Cambridge CB4 0WZ Data via plota.co.uk

Proposal

Outline planning application with all matters reserved (save for means of access), for a flexible phased development in separate and severable components comprising the demolition and retention of existing buildings and erection of new buildings to provide: (i) employment generating floorspace comprising Use Class E(g)(i) (offices) and Use Class E(g)(ii) (research and development),flexible Class E(a-f) and Classes F1 and F2 for retail, leisure, community uses and Sui Generis including associated plant, (ii) residential development in Use Class C3 and Sui Generis (co-living), and associated plant, (iii) erection of mobility hubs (Sui Generis) for vehicular and cycle parking and associated plant, and (iv) means of access comprising new pedestrian, cycle and vehicular accesses from Cowley Road, new pedestrian and cycle accesses from the Cambridgeshire Guided Busway, provision of a new bus stop and crossing points of the Guided Busway, open spaces, landscaping, and associated infrastructure. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Jul 2026
✓
Validated
10 Jul 2026
✓
Consultation
16 Jul 2026
Decision
Expected by 30 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 91.

Site constraints 3

National infrastructure project 350 m away: Cambridge Waste Water Treatment Plant Relocation
The site is 350 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: A14 Cambridge to Huntingdon Improvement Scheme (decided, 820 m); East West Rail - Bedford to Cambridge and Western improvements (at pre-application, 377 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Local nature reserve 320 m away: Bramblefields; Inside the Cambridge (Cambridge) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cambridge
Application type
Outline Application
Postcode
CB4 0WZ
Received
2 Jul 2026
Validated
10 Jul 2026
Ward
East Chesterton
Case officer
Show
Target decision
30 Oct 2026
Applicant
Show
Agent
WSP

Decision outlook

Day 91, past the statutory target. 79% of commercial and major works in Cambridge are decided within thirteen weeks, which runs to 9 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 5 Oct 2026.

Day 9135 days past the 56-day target
48%decided within 8 weeks
85%approved
6%go to committee

Plota live figures for commercial and major works decided by Cambridge in the last twelve months, from validation. Cambridge decision record →

Public comments

1comment received
1 objecting

301 neighbours consulted · Last counted 5 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Site or press notice
16 Jul 2026
Statutory expiry
30 Oct 2026
Env. assessment
Yes
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 councils
Relevant to this application:
Major dwellings

Cambridge is one of the fastest councils in England for householder decisions, ranking #21 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026